DRAWING                                
      NRCS TEMPORARY(T)/ EXISTING(E)/         85400   REMEDIAL RECLAMATION AS-BUILT DESIGN DESIGN DESIGN     DESIGN DESIGN DESIGN SPILLWAY DESIGN DESIGN  
  OBS POND HAZARD PERMANENT (P) PROPOSED (P)/ EASTING NORTHING LONGITUDE LATITUDE MAP CONSTRUCTION WORK DATE EMBANKMENT TIME OF CURVE DRAINAGE DESIGN RUNOFF DESIGN STORAGE SPILLWAY SPILLWAY SPILLWAY CRITICAL SPILLWAY SPILLWAY AS-BUILT STORAGE
    ID CLASS STRUCTURE RECLAIMED (R) COORDINATE COORDINATE (D:M:S) (D:M:S) NUMBER DATE SCHEDULE (YEAR) CATEGORY CONCENTRATION(HR.) NUMBER AREA (AC) CAPACITY (AC-FT) CAPACITY (AC-FT) ELEVATION TYPE FLOW RATE (CFS) VELOCITY (FPS) WIDTH (FT) LENGTH (FT) CAPACITY (AC-FT)
  1 BM-A1 A T E 27800 -37440 110:23:55 36:26:35 K-10 80/10 OK 2030 A-5 0.212 85 80.8 5.98 18.60 6416.4 Open Channel 26 3.0 30 50 18.60
  2 BM-B A T E 27050 -35870 110:24:04 36:26:50 K-10 83/03 OK 2030 A-5 0.128 82 51.9 3.30 12.76 6373.6 Open Channel 6 2.1 20 30 11.49
  3 BM-FWP A T E 31400 -24250 110:23:00 36:28:45 L-09 73/09 OK 2030 INCISED 0.016 96 2.3 NA 7.94 6612.2 None Required NA NA NA NA 9.62
  4 BM-SS A T E 35000 -28470 110:22:27 36:28:04 K-10 80/06 OK 2030 A-5 0.108 71 76.5 2.10 7.25 6409.7 Open Channel 4 2.0 15 30 6.83
  5 BM-T A T E 29700 -36800 110:23:30 36:26:35 K-10 90/06 OK 2030 B-4 0.040 91 3.2 NA 0.76 6486.0 Open Channel 4 2.1 18 27 1.95
  6 BM-TW A T E 29150 -35650 110:23:00 36:26:50 K-10 90/06 OK 2030 A-5 0.084 91 5.5 NA 1.87 6488.0 18"-CMP 9 NA 1.5 40 2.39
  7 CW-A A T E 24300 -18000 110:24:38 36:29:47 K-08 80/05 OK 2011 A-5 0.995 81 1230.0 NA 9.34 6471.9 Open Channel 333 7.0 21 35 9.34
  8 J16-A MSHA-A P E 55313 -15756 110:18:18 36:30:09 M-08 82/08 OK PERMANENT MSHA-A 1.362 81 2415.0 134.61 261.00 6635.0 Open Channel 976 NA 300 30 261.00
  9 J16-D A T E 53918 -16785 110:18:35 36:29:59 M-08 82/08 OK 2027 B-1 0.127 83 51.6 3.24 7.24 6595.1 Open Channel 22 3.5 15 30 9.91
  10 J16-E A T E 53883 -17080 110:18:36 36:29:56 M-08 82/06 OK 2005 B-1 0.066 83 14.4 1.00 6.39 6608.3 Open Channel 5 2.0 20 30 6.74
  11 J16-F A T E 53345 -17255 110:18:42 36:29:54 M-08 82/06 OK 2005 B-1 0.065 91 19.2 2.04 9.34 6591.9 Open Channel 8 2.3 20 30 9.36
  12 J16-G A P E 52120 -17715 110:18:57 36:29:50 M-08 82/08 OK PERMANENT A-1 0.237 81 272.0 16.22 19.65 6576.0 Open Channel 680 7.1 50 40 26.97
  13 J16-L MSHA-A P E 50690 -24090 110:19:15 36:28:47 M-09 84/07 OK PERMANENT MSHA-A (SEE DESIGN) (SEE DESIGN) 7873.0 358.60 384.91 6573.4 Open Channel 1012 NA 30 150 398.99
  14 J19-A A T P 49960 -32098 110:19:24 36:27:28 M-10 2004 OK 2023 NOT BUILT 0.174 88 107.8 9.40 18.27 6825.0 Open Channel 79 4.4 15 32 NOT BUILT
  15 J19-B A T P 46211 -33275 110:20:10 36:27:16 M-10 2004 OK 2023 NOT BUILT 0.163 85 88.6 6.40 12.94 6769.5 Open Channel 60 4.3 15 29 NOT BUILT
  16 J19-D A T P 47390 -35965 110:19:55 36:26:50 M-10 2004 OK 2023 NOT BUILT 0.203 85 130.5 9.50 19.83 6744.5 Open Channel 77 4.7 20 29 NOT BUILT
  17 J19-E A T P 47365 -36761 110:19:55 36:26:42 M-10 2004 OK 2023 NOT BUILT 0.065 85 17.5 1.30 6.51 6798.0 Open Channel 4 2.0 15 26 NOT BUILT
  18 J19-RA A T E 63310 -28500 110:16:35 36:28:02 N-09 2004 OK 2037 Incised 0.567 81 1631.7 370 691.27 6732.0 None Required None None None None NOT BUILT
  19 J19-RB A P P 60580 -31960 110:17:14 36:27:28 M-10 2004 OK PERMANENT Incised 0.311 81 517.1 141 212.04 6875.0 None Required None None None None NOT BUILT
  20 J1-A A T P 28225 -18658 110:23:49