This is the Office of Surface Mining's library of COALEX Research Reports. COALEX is a database of mining and reclamation information, including the Surface Mining Law and regulations, maintained in LEXIS-NEXIS -- a commercial, on-line research service. These reports have been compiled under a cooperative agreement between the Office of Surface Mining and the Interstate Mining Compact Commission, which represents most U.S. coal producing states. The following report includes an analysis of a specific issue requested by a state regulatory authority with responsibility for carrying out the Surface Mining Law. Copies of the research reports and attachments are available to the public, upon request. For additional information, or to obtain copies of the listed attachments, contact Ron Tarquinio by phone at (202) 208-2882 or by e-mail at rtarquin@osmre.gov.
                   
COALEX STATE COMPARISON REPORT - 147
July 17, 1990

Anthony Abar, Director
Maryland Bureau of Mines
69 Hill Street
Frostburg, Maryland 21532

TOPIC: PERMIT, ACREAGE AND INSPECTION FEES [Update of Report No. 17, (1984)]

INQUIRY: What are the permit application and acreage fees for the following states: Kentucky,
Ohio, Pennsylvania, Virginia and West Virginia? Do these states charge inspection fees?

SEARCH RESULTS: The IMCC conducted a telephone survey of the five states listed above plus
Illinois and Texas. The results presented in the attached table update State Comparison Report
No. 17, prepared in 1984. A copy of Report No. 17 is included for reference.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

ATTACHMENTS
A.   TABLE OF FEES.
B.   STATE COMPARISON REPORT - 17.


Survey conducted by: Beth Bostsis



TABLE OF FEES
(Reformatted from original)

STATE
INSPECTION FEES
PERMIT FEES
ACREAGE FEES


KENTUCKY
Inspection Fees: No
Permit Fees: $ 375  Permit application processing fee
Acreage Fees: $ 75  Per acre.


ILLINOIS
Inspection Fees: No
Permit Fees:  --
Acreage Fees: $ 125  Per bonded acre when overburden is removed. 
          $ 5  Per acre not actually mined.
          May be additional charges in special circumstances. 
          No renewal fee.


OHIO
Inspection Fees:  No
Permit Fees:  --
Acreage Fees: $ 75  Per acre. 
          There is a refund for areas not affected or disturbed. 
          Fee was increased from $ 50 in 1986.


PENNSYLVANIA
Inspection Fees: No
Permit Fees: $ 250 Permit application fee.
Acreage Fees: $ 50  Per bonded acre.
          May be additional charges, depending on the operation, e.g., if it will
          alter/obstruct a body of water.


TEXAS
Inspection Fees: No
Permit Fees: $ 5,000  Permit fee.
          $ 500  Revision fee.
          $ 3,000  Renewal fee.
Acreage Fees: $ 120 Per acre of land which had coal or lignite actually removed during calandar
year charged.


VIRGINIA
Inspection Fees: No
Permit Fees: --
Acreage Fees: $ 12 Per acre permitting fee.
          $ 6  Per acre renewal fee.


WEST VIRGINIA
Inpsection Fees: No
Permit Fees: $ 500  Quarry permit application filing fee.
          $ 1,000  Fee for all other permit applications.
          $ 500  Addition fee for NPDES permit if filed at the same time.
          $ 2,000  Renewal fee.
          $ 100  NPDES reissuance fee.
          $ 500  Prospecting fee.
Acreage Fees: --