This is the Office of Surface Mining's library of COALEX Research Reports. COALEX is a database of mining and reclamation information, including the Surface Mining Law and regulations, maintained in LEXIS-NEXIS -- a commercial, on-line research service. These reports have been compiled under a cooperative agreement between the Office of Surface Mining and the Interstate Mining Compact Commission, which represents most U.S. coal producing states. The following report includes an analysis of a specific issue requested by a state regulatory authority with responsibility for carrying out the Surface Mining Law. Copies of the research reports and attachments are available to the public, upon request. For additional information, or to obtain copies of the listed attachments, contact Ron Tarquinio by phone at (202) 208-2882 or by e-mail at rtarquin@osmre.gov.
                   
COALEX State Comparison Report - 166
January 22, 1991

Randall Johnson, Director
Alabama Surface Mining Commission
P.O. Box 2390
Jasper, Alabama 35502-2390

TOPIC: PERMITTING OF WETLANDS - PROCEDURES FOR NOTIFYING THE ARMY CORPS OF
ENGINEERS

INQUIRY: The Army Corps of Engineers (the Corps) is one of the federal agencies that is notified
of and given an opportunity to review surface coal mining permit applications (33 CFR 330.5
Nationwide Permits, Paragraph 21). If wetlands are included in the area to be permitted, does
the Corps always require the operator to obtain a separate "404 permit" (33 CFR 330.5 (26))?
What procedures do the eastern states follow in notifying the Corps of permit applications? Do
any states have a single permitting process which satisfies both SMCRA and Section 404 (Clean
Water Act, 33 USCS 1344) permitting requirements?

SEARCH RESULTS: A survey of eight eastern states was conducted. The survey began asking
each state for comments on how the Corps applies 33 CFR 330.5 (21) versus 33 CFR 330.5 (26)
for applications including wetlands. It was quickly determined that the question was too narrowly
focused and, as a result, the following set of questions were developed:

1.   What procedures does your state follow in notifying the Corps when a permit application is
     received? Are any different procedures followed, either with the Corps or the applicant,
     when the area to be permitted includes wetlands? Do the district engineers with
     jurisdiction for your state generally require separate 404 permits for wetlands (33 CFR
     330.5(26)) or are the standard review and permitting procedures sufficient (33 CFR
     330.5(21)?

2.   Does the Corps require a 404 permit when there will be no net loss of wetlands?

3.   Has there been any recent change in the Corps' enforcement of its regulations? In
     particular, has there been any recent change in the amount or type of information the
     Corps requests from state regulatory authorities (RAs)?

Copies of the CFR and USCS sections as well as excerpts from relevant Federal Register
preambles are attached.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

ARKANSAS
1. Arkansas has no wetlands/mining problems. Wetlands are located in the eastern, agricultural,
part of the state. Arkansas does not routinely notify the Corps when a permit application is
received. If an area to be permitted included wetlands, the RA would notify the Corps and the
state game and fish service to determine the need for a 404 permit. 

   The state has problems with the Corps and 404 permitting when wetlands occur on abandoned
mine land (AML) sites. The RA notifies the Corps and the state game and fish service in such
cases. Generally, the 404 permitting process takes six months and requires cite specific permit
conditions rather than a nationwide permit. The state has encountered considerable difficulty
getting landowners to agree to sign the 404 permit and allow the state right of entry because the
404 remains in effect "in perpetuity". The state is often caught in the middle between the Corps
and the landowners.

   Arkansas is introducing legislation in Congress to amend the Clean Water Act in the following
ways:
     a.   Establish a more specific definition of wetlands. 
     b.   Exempt AML projects from Corps permitting.
     c.   Establish a termination date for the 404; once the goals of the permit are
          accomplished, return the land back to the landowner.

2. The Corps determines the need for 404 permits.

3. The Little Rock Corps office strictly enforces the "perpetual maintenance" aspect of the AML
404 permits. Other Corps offices do not seem to be as strict on this issue.


ILLINOIS
1. The Illinois RA sends notification to the appropriate Corps district office when a permit
application is received. It is the Corps' responsibility to determine whether a 404 permit is
required and notify the applicant of its determination.

2. Corps makes all determinations on the need for 404 permits.

3.  Illinois has a meeting scheduled with the Corps to discuss a number of permitting-related
issues. The RA recently received a letter from the St. Louis Corps office requesting that the RA
send them more information on each permit application the state receives. The Louisville Corps
office continues to request more information from the RA than simple notification of a new permit
application. The Corps seems to want the state RA to help them decide if the operator needs a
404 permit.


INDIANA
1. The Indiana RA sends the Corps notification when a new permit application is received. Indiana
screens the application in advance for the likelihood of the need for a 404 permit; however, the
Corps makes the actual determination. For applications which might require a 404 permit, the RA
informs the state fish and wildlife service representative, located in the same office. The state
representative notifies the U.S. Fish and Wildlife Service so that they have the appropriate
information in the event the Corps notifies them of the need for a 404 permit for a particular
operator.

   When necessary, the RA acts as a facilitator or mediator between the operator and the Corps to
ensure all of the requirements of the 404 permit are met.

2. The Corps makes all determinations on the need for a 404 permit.

3. Indiana has not noticed any recent change in the Corps' enforcement of the regulations.

KENTUCKY
1. Western Kentucky has a large number of wetlands. When Kentucky receives a permit
application, the RA notifies the applicant if the area to be permitted contains regulated wetlands
and requires the operator to contact the Corps for a determination of the need for a 404 permit.
If a 404 permit is required, the state will facilitate and coordinate activities among the state
agencies (e.g., the Division of Water), the Corps and the operator. The operator is required to
follow a stringent set of state regulations whether or not a 404 permit is required by the Corps.
For example, the RA notifies the state Division of Water to track the impact of mining on the
water quality and may include conditions in the permit requiring avoidance, recreation or
mitigation of the wetlands. Permit specific conditions for wetlands are incorporated into the state
surface mining permit.

2. The Corps makes all determinations on the need for 404 permits.

3. There has been no change in the Corps' enforcement of the regulations in Kentucky. The state
rules regulating mining on wetlands are more stringent than the federal rules. Industry prefers
the 404 permit; they find it easier to obtain a 404 permit than a state permit.  


MARYLAND
1. The Corps is one of the agencies notified when a surface mining permit application is received.
Corps makes its own determinations on the need for 404 permits and sets its own conditions. On
January 1, 1991 the Wetlands Protection Act, passed by the Maryland legislature in July, 1989,
went into effect. This Act set criteria for wetlands that are the same as the federal criteria.
According to this new statute, the state will issue a permit for any wetlands which disturbs less
than five acres; the Corps will retain oversight authority. Wetlands over five acres will require a
multi-permit application which will trigger coordinated review by the Corps and the other state
and federal agencies. 

2. The Corps has final authority to require 404 permits. 

3. Both Maryland and the Corps have changed. Prior to the enactment of the Wetlands Protection
Act, the RA notified the Corps of surface coal mining permit applications and left wetlands
identification and regulation to the Corps. The Maryland Corps district, located in Baltimore,
established its authority in requiring 404 permits; however, they conducted little enforcement
once the permits were issued. Beginning this January, the state will take a more active role in
identification and regulation of wetlands. The Corps has recognized that they are not able to do
everything and have to delegate some responsibilities to other agencies.


OHIO
1. The RA sends the Corps notification when a permit application is received. When the RA
receives an application which includes wetlands (Ohio does not have much wetlands in the coal
mining regions), it usually works directly with the U.S. Fish and Wildlife Service to develop a
restoration plan. While the Corps receives information on permit applications and restoration
plans for wetlands, they do not usually provide any comments.

2. The restoration plan for a recent wetlands permit, coordinated with the U.S. Fish and Wildlife
Service, yielded "no net loss of wetlands". No 404 permit was required: the Corps failed to
comment on the plan which had been sent to them. 


3. Ohio recently received a request from the Corps to include a notice to surface mining permit
applicants indicating that if their permit area includes wetlands they need to contact the Corps.
Ohio will send out the notice when the Corps rewrites it, making it more specific to coal mining.
The next draft from the Corps is due in about a month. 

   Most correspondence from the Corps comes from the Huntington, West Virginia office.


PENNSYLVANIA
1. When mining operations effect wetlands, the permitting staff conducts an environmental
review and notifies the Corps and appropriate state agencies. The state conducts multi-faceted
reviews and tries to incorporate all requirements, including 404 wetlands authorizations, into a
single surface mining permit.

2. The Corps determines the need for a 404 permit and issues a separate authorization which
may or may not be incorporated into the state permit. Pennsylvania has not encountered a "no
net loss" permit request. Operators will generally delete wetlands from their permit area in such
instances because the expense is not worth the return.

3. No change in enforcement has been noted.


VIRGINIA
1. There are no significant numbers of wetlands in Virginia. Virginia does not routinely notify the
Corps when a permit application is received. The RA would notify the Corps if an area to be
permitted included wetlands. 

2. The Corps determines the need for a 404 permit.

3. Virginia has "quasi wetlands". It is working with the Corps to establish procedures to regulate
these areas.


ATTACHMENTS
A.   33 CFR 330.5 Nationwide Permits.
B.   33 USCS 1344 (1990) Permits for dredged or fill material.
C.   47 FR 31794 (JULY 22, 1982). Interim Final Rule for Regulatory Programs of the Corps of
     Engineers. [33 CFR Parts 320-330.] {Excerpts}
D.   48 FR 21466 (MAY 12, 1983). Proposal To Amend Permit Regulations for Controlling
     Certain Activities in Waters of the United States. [33 CFR Parts 320, 322, 323, 325, 327,
     328 & 330.] {Excerpts}
E.   49 FR 39478 (OCTOBER 5, 1984). Final Regulations for Controlling Certain Activities in
     Waters of the United States. [33 CFR Parts 320, 323, 325 & 330.] {Excerpts}
F.   51 FR 41206 (NOVEMBER 13, 1986). Final Rule for Regulatory Programs of the Corps of
     Engineers. [33 CFR Parts 320-330.] {Excerpts}
G.   48 FR 30312 (JUNE 30, 1983). Final rule. [30 CFR Parts 816 & 817. Stream Buffer Zones
     and Fish, Wildlife, and Related Environmental Values.] {Excerpts}
H.   48 FR 43956 (SEPTEMBER 26, 1983). Final rules. [30 CFR Parts 701, 779,780,783, 784,
     816, & 817. Hydrology Permitting and Performance Standards; Geology Permitting.]
     {Excerpts}
I.   48 FR 44344 (SEPTEMBER 28, 1983). Final rule. [30 CFR Parts 701, 770, 771, 773, 774,
     775, 777, 778, 782, 786, 787 & 788. Permitting -- Processing, General Content, and
     Legal, Financial, Compliance, and Related Information Requirements of Applications.]
     {Excerpts}
J.   47 FR 23886 (JUNE 1, 1982). Final rule. [30 CFR Part 913. Abandoned Mine Land
     Reclamation Plan for the State of Illinois.] {Excerpts}
K.   51 FR 40793 (NOVEMBER 10, 1986). Final rule. [30 CFR Part 918. Abandoned Mine Land
     Reclamation Plan for the State of Louisiana.] {Excerpts}
L.   52 FR 3004 (JANUARY 30, 1987). Final rule. [30 CFR Part 920. Approval of Maryland
     Program Amendments.] {Excerpts}


Research conducted by: Joyce Zweben Scall





(Home Page)

Office of Surface Mining
1951 Constitution Ave. N.W.
Washington, D.C. 20240
202-208-2719
getinfo@osmre.gov