COALEX STATE INQUIRY REPORT - 208
March, 1992
Roger Shaffer
Wyoming Department of Environmental Quality
Land Quality Division
Herfler Building; 3rd floor - West Wing
122 West 25th Street
Cheyenne, Wyoming 82002
TOPIC: EXTENSION OF CONDITIONS ON FEDERAL COAL LEASE TO STATE'S PERMIT OF
PRIVATELY-OWNED SURFACE
(Includes COALEX REPORT - 154)
INQUIRY: An operator is mining federally-owned coal under privately-owned surface. The
Wyoming regulatory authority wants to place the same conditions on the state mining permit that
exist on the federal coal lease. Please locate any OSM or Bureau of Land Management (BLM)
materials which discuss this issue.
SEARCH RESULTS: Research was conducted using the COALEX Library, other materials available
in LEXIS and existing COALEX Reports. The Secretary, in the preamble to the 1983 Federal Lands
Program Final Rule, stated the relationship between conditions added on the Federally-approved
mining plan and the incorporation of these conditions into the State-issued permits:
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
48 FR 6912 (FEBRUARY 16, 1983). Final rule. Federal Lands Program.
"OSM has adopted, as proposed, revised sec. 740.13(c)(1), 'Permit terms and conditions,' which
provides that any applicable requirements of other Federal laws and regulations, including the
Mineral Leasing Act, must be reflected in the terms and conditions for permits."
...
"One commenter asked OSM to clarify whether it is the State's responsibility to incorporate the
terms of the lease and other requirements of the MLA [Mineral Leasing Act of 1920] and other
Federal laws in the SMCRA permit and, if so, who would enforce such terms and requirements.
While States with cooperative agreements may independently review and approve permit
applications on Federal lands, these regulations prohibit the commencement of operations that
are subject to mining plan approval until the Secretary has approved such plan. In order to
ensure compliance with non-SMCRA matters (e.g., MLA, NEPA, lease terms and stipulations, etc.)
the Secretary may impose additional requirements for mining in his approval of the mining plan.
OSM will rely on the States with cooperative agreements to assist in enforcing these additional
requirements as part of the State's inspection and enforcement program. Each cooperative
agreement will detail how these responsibilities will be handled since the precise roles of OSM and
the States will vary from State-to-State."
[Also see discussion of this rule, below.]
The Federal Register preambles and other relevant materials identified discuss Federal versus
State responsibilities under SMCRA, the Mineral Leasing Act (MLA) and other Federal land
management acts, and the responsibilities of other agencies, particularly BLM. Copies of the items
listed below are attached.
EXISTING COALEX REPORTS
COALEX STATE INQUIRY REPORT No. 154, "State permitting on federal lands" (January, 1990).
This report discusses the state's right to issue permits for coal mining operations which were
conducted on federal lands prior to the approval of the state SMCRA regulatory program. The
Interior administrative decisions and the Federal Register preambles relevant to the issues here
are listed below.
REGULATORY HISTORY
MARCH 13, 1979 (44 FR 14902). Permanent Program Final Preamble -- Final Rule.
a. Subchapter A, Part 700 -- General. Sec. 700.4 Responsibilities and 700.5 Definitions. [Excerpts]
"Other commenters recommended a change in the definition [of Federal lands] to exempt private
lands overlying federally owned coal rights. Exemption of privately owned surface was suggested
in order to clarify Congressional intent that the private surface be controlled by the owner.
Congress considered and provided protection for surface owners in Section 714 of the Act. An
exemption for private surface would be a departure from the statutory definition. If private
surface overlying Federal coal were exempted from the Federal lands definition then, arguably,
the lands would fall under a State program and the State would serve as the regulatory authority
over the extraction of Federal coal. This would be an unauthorized result, particularly, when
under Section 714 of the Act the Federal Government would be leasing the coal under the Mineral
Lands Leasing Act of 1920, as amended."
b. Chapter VII, Subchapter D. Part 740 -- General Requirements for Surface Coal Mining and
Reclamation of Federal Lands.
This part provided general definitions and administrative responsibilities for surface coal mining
and reclamation operations on Federal lands. "The major objective of the Subchapter is to ensure
that coal exploration and surface coal mining and reclamation operations, involving Federal lands
and Federal coal interests, comply with the spirit and intent of the Act."
Under Section 740.2 [Objectives], the Secretary discussed responsibilities under the Mineral
Leasing Act, the Federal Coal Leasing Amendments Act of August 4, 1967 and SMCRA with regard
to coal exploration.
c. Chapter VII, Subchapter D. Part 741 -- Permits
"Part 741 provides for application, revision, renewal and cancellation of permits to conduct
surface coal mining operations on Federal lands. Its purpose is also to ensure that surface coal
mining and reclamation operations on Federal lands are conducted only after the Department has
determined that reclamation as required by the Act is feasible."
One of the proposed rules "specified that wherever surface coal mining operations involved
both Federal and private lands, the operations on private lands must be conducted in accordance
with the requirements of Part 741. The intent of this Paragraph is to afford protection of Federal
lands from surface coal mining activities on private lands, where such operations involve both
Federal and private ownerships." The alternative adopted as final rule section 741.11(b) [General
Obligations] "would require, as a condition of departmental approval to begin or continue
operations on Federal lands, operations on intermingled non-Federal lands to be conducted in a
manner which will not preclude compliance with the performance standards in Subchapter K on
Federal lands."
Under section 741.12 [Relation of Permit to Mining Plan], the Secretary analyzed the
interdependent relationship of the mining permit and reclamation plan requirements of SMCRA
and the operations reclamation plan provisions of the MLA: SMCRA prohibits the Secretary from
delegating responsibility for approval or disapproval of operations and reclamation plans to the
States. "Therefore, the Office must recognize and incorporate the mandates of the Mineral
Leasing Act of 1920, as amended into the Federal lands program required by the Act. A mining
permit cannot be issued without an approved operation and reclamation plan....a surface coal
mining and reclamation permit required by Section 506 of the Act cannot be issued unless the
Secretary has approved an operations and reclamation (mining and operations) plan required by
the Mineral Leasing Act of 1920, as amended. Conversely, an approved operations and
reclamation plan does not constitute authority to commence surface mining and reclamation
operations."
[NOTE: This section was removed in the revisions of February 16, 1983. Portions of the sections
were incorporated into section 740. See below.]
d. Chapter VII, Subchapter D. Part 745 -- State-Federal Cooperative Agreements.
"The objective of this Part is to provide for uniform application of environmental and reclamation
standards to surface coal mining operations within a State through the exercise of regulatory
authority by the State."
The basic purpose of a cooperative agreement is "to reduce duality of administration and
enforcement."
In discussing a commenter's suggestion to delete portions of 745.13 [Authority Reserved by the
Secretary], the Secretary stated that the provisions of 745.13(k) do not "ignore the right of a
State to regulate its end use of private surface or preclude the imposition of more stringent State
statutes. The provisions of this paragraph only apply to Federal lands. Where such interest involve
only Federal minerals, end use of land surface must be in accord with State land use policies and
procedures as required by the Federal Coal Leasing Amendments Act. Further, Section 505(a) and
(b) of the Act provide for the application and enforcement of existing, more stringent States
laws."
SEPTEMBER 28, 1979 (44 FR 56272). Proposed rule.
This notice, enclosed for background, proposed amendments to 701.11 and 741.11, concerning
the schedule for operator compliance with permanent program performance standards on Federal
lands.
DECEMBER 31, 1979 (44 FR 77440). Final rule.
This rule amended 701.11 and 741.11 by postponing the effective date for operator compliance
with the permanent program on Federal lands until the date of approval of a State program.
JUNE 9, 1982 (47 FR 25092). Proposed rule. Federal Lands Program. [Included as part of Report
No. 154.]
These amendments were proposed to more clearly delineate the roles of the Federal
government and the States in regulating surface mining operations on Federal lands.
[See discussion of Final rule, below.]
FEBRUARY 16, 1983 (48 FR 6912). Final rule. Federal Lands Program. [Included as part of Report
No. 154.]
These final rules provided States with a greater responsibility for administering the
requirements of SMCRA on Federal lands and revised the process for review and approval of
mining plans by the Secretary. The Secretary's approval of mining plans was required only where
leased Federal coal was involved.
1. Applicability of State and Federal Programs on Federal Lands. Requirements of State programs
approved by the Secretary are incorporated into the Federal lands program for each State. This
ensures that the Federal lands provisions are applicable both on and off non-Federal lands within
the State. [This is the
explanation given for the reference to "uniform standards" in the March 13, 1979 preamble to
Part 745 -- see above.]
2. Permit Application and Mining Plan Review and Approval. "OSM proposed to separate permit
approval from mining plan approval by providing that States with cooperative agreements would
independently review and approve SMCRA permits, while the Secretary would retain responsibility
for approval of mining plans as required under the Mineral Leasing Act and section 523(c) of
SMCRA", as well as retaining other non-delegable responsibilities. Where there is leased Federal
coal, the operator must file a resource recovery and protection plan (RRPP) within three years of
leasing. BLM retained responsibility for reviewing the RRPP and providing its recommendation to
OSM. OSM was responsible for preparing a decision document for the Secretary that
recommended approval, conditional approval or disapproval of the mining plan. "The State could
issue the SMCRA permit following completion of its review of the permit application, although
actual commencement of mining would have to await Secretarial approval of the mining plan....
Where there are inconsistencies, the Secretary reserves the right to require the operator to
comply with any additional conditions or requirements of the approved mining plan."
As a result of these revisions, Parts 741, 742, 743 and 744 were removed; portions of these
Parts were incorporated into Part 740.
APRIL 1, 1983 (48 FR 13984). Final rule; corrections. Federal Lands Program.
Corrections to the February 16th rule.
IN RE: PERMANENT SURFACE MINING REGULATION LITIGATION, 21 ERC 1193, 14 ELR 20617
(D DC July 6, 1984), amended August 30, 1984.*
The court ruled that the February 16, 1983 regulations inappropriately limited the applicability
of the Federal lands program by excluding lands containing unleased Federal coal beneath State
or private surface. In addition, the court found that rendering a decision on the operation and
reclamation plan portions of the permit application is the responsibility of the Secretary and may
not be delegated to the States.
*Also see IN RE: PERMANENT SURFACE MINING REGULATION LITIGATION, 22 ERC 1557 (D C
March 22, 1985) and NATIONAL WILDLIFE FEDERATION v HODEL, 839 F 2d 694 (DC Cir January
29, 1988).
MAY 31, 1989 (54 FR 23388). Proposed rule. Federal Lands Program.
OSM proposed to revise paragraph (d) of section 740.4 [Responsibilities] which described the
responsibilities of BLM for exploration on Federal lands where BLM has regulatory jurisdiction
pursuant to 43 CFR Group 3400.
In accordance with the District Court decision, section 740.11 [Applicability] would be revised
"to provide that upon approval or promulgation of a regulatory program for a State, that program
and 30 CFR Subchapter D shall apply to surface coal mining and reclamation operations taking
place on any Federal lands... This means that where surface coal mining operations occur on
lands where the surface, the minerals, or both, are federally owned, the Federal lands program
will apply."
MARCH 13, 1990 (55 FR 9400). Final rule. Federal Lands Program.
OSM did not adopt the proposed revisions to 740.4(d). The revisions may be reconsidered in
conjunction to revisions under consideration by BLM to its rules on the same subject.
The wording of the applicability section 740.11(d) was changed from the proposed text to make
the paragraph "more explicit". OSM, in responding to commenters, reaffirmed that the Federal
lands program at 30 CFR Part 740 "applies to unleased coal under non-Federal surface."
JULY 12, 1991 (56 FR 32002). BLM Proposed rule. 43 CFR Group 3400: Coal Management --
General; Coal Management Provisions and Limitations; Coal Exploration an Mining Operations,
etc.
These proposed rules would revise provisions of the operations-related portions of the existing
Federal Coal Management Program regulations relating to lease management, mining operations,
etc. on leased Federal coal.
43 CFR Part 3480 -- Coal Exploration and Mining Operations. Subpart 3481 General Provisions.
These proposed rules state that BLM would be responsible for administering all exploration
operations on unleased Federal lands and on leased Federal lands outside the area of an
approved SMCRA permit. "Under SMCRA, the regulatory authority would retain the responsibility
for exploration for non-Federal coal contained in an approved SMCRA permit area and assume all
SMCRA responsibility for exploration for Federal coal within the area of an approved SMCRA
permit."
WYOMING-FEDERAL COOPERATIVE AGREEMENT
46 FR 9065 (JANUARY 28, 1981). Final rule. Operations on Federal Lands Under the Permanent
Program; State-Federal Cooperative Agreements; Wyoming. Final rule.
"Article III [Scope] provides that the laws, regulations, terms and conditions of the State program
are applicable to Federal lands in Wyoming, except as otherwise stated in the agreement, the
Act, 30 CFR 745.13 ('Authority reserved by the Secretary.') or other applicable laws."
. . .
"One commenter argued that the Department has incorrectly interpreted...its jurisdiction over
Federal lands to include privately-owned surface overlying federally-owned coal. This commenter
believed that this interpretation thwarts the Congressional intent that the States have the primary
responsibility for regulation of surface coal mining. The Secretary has rejected this comment for
two reasons. First, similar comments were received, considered and rejected during the
development of the permanent regulatory program...See, 44 FR 14911, 14973, March 13, 1979.
The Secretary is not aware of any action presently pending before any Federal court in which this
interpretation of "Federal lands" is under challenge. Second, this interpretation of Federal lands
has in no way thwarted the Secretary from agreeing, pursuant to the cooperative agreement, to
provide for State regulation of surface coal mining on Federal lands in the State."
51 FR 45082 (DECEMBER 16, 1986). State-Federal Cooperative Agreements; Wyoming. Final rule.
Consistent with the July 6, 1984 district court decision (see above), this cooperative agreement
delegated greater responsibility for regulating surface coal mining and reclamation operations of
Federal lands to the State regulatory authority, with the Secretary retaining the "non-delegable
responsibilities under the Mineral Leasing Act."
. . .
Article III [Scope] was revised to clarify the proper jurisdiction for appeals of orders and
decisions from their respective agencies: orders and decisions issued by the State "shall be
appealed as provided for by State law", those issued by OSM "shall be appealed to the
Department's Office of Hearings and Appeals."
OSM DIRECTIVES
OSM DIRECTIVE: Subject No. REG-31, Transmittal No. 584, "Preparation of Mining Plan Decision
Documents" (Issued October 24, 1989).
This directive establishes the procedures for preparing and processing the mining plan decision
documents for surface coal mining operations on lands containing leased Federal coal.
According to the MLA the Secretary of Interior must approve, approve with conditions, or
disapprove these mining plans.
Although BLM has responsibility for implementation of the MLA, OSM prepares the
documentation for the Assistant Secretary, Land and Minerals Management who has responsibility
for making the approval decision.
"Two key approvals are required to conduct surface coal mining operations on Federal leases.
One is approval of the SMCRA permit application by the regulatory authority and the other is the
Assistant Secretarial approval of the mining plan. Actions and documentation necessitated by
mining plan approval are to reflect the distinction between SMCRA permitting and mining plan
approval."
OSM DIRECTIVE: Subject No. REG-34, Transmittal No. 591, "Processing Applications for Federal
Permits" (Issued January 9, 1990).
"This directive outlines the basic procedures for the review and processing of applications for new
permits for surface coal mining operations where [OSM] is the regulatory authority."
. . .
"Where OSM issues a permit on Federal lands in a State with an approved regulatory program,
the [Federal permitting entity] shall apply the approved State program counterparts to the
Federal regulations cited in this directive to reach decisions on permit applications."
OHA DECISIONS
NATURAL RESOURCES DEFENSE COUNCIL, INC. v OSM, WEST ELK COAL CO., INTERVENOR, 94
IBLA 269, IBLA 83-757 (IBSMA 81-83) (1986, amends 1985 decision). [Included from COALEX
Report No. 154]
West Elk contended that the Board no longer had jurisdiction over the mine in question and
that the "Federal permit upon which this case [was] premised [was] moot due to the cooperative
agreement" between DOI and State of Colorado: at the time of the original permit issuance both
a federal and a state permit were necessary, with the cooperative agreement in force, only a
state permit was necessary to mine. The Board ruled that a "cooperative agreement does not
vest the state with complete control over
mining on Federal lands." The state is responsible for "approving or disapproving the mining
permit, but the Secretary retains authority to approve or disapprove the operation and
reclamation plan component of the application."
OLD BEN COAL CO. v OSM, 109 IBLA 362, IBLA 88-8 (June 23, 1989).
The Board ruled it was proper for OSM to condition approval of an underground mining permit
on compliance with State regulations in force at the time (governing subsidence damage control).
ATTACHMENTS
A. COALEX STATE INQUIRY REPORT No. 154, "State permitting on federal lands" (January,
1990).
B. MARCH 13, 1979 (44 FR 14902). Permanent Program Final Preamble -- Final Rule.
a. Subchapter A, Part 700 -- General. Sec. 700.4 Responsibilities and 700.5
Definitions. [Excerpts]
b. Chapter VII, Subchapter D. Part 740 -- General Requirements for Surface Coal
Mining and Reclamation of Federal Lands.
c. Chapter VII, Subchapter D. Part 741 -- Permits
d. Chapter VII, Subchapter D. Part 745 -- State-Federal Cooperative Agreements.
C. SEPTEMBER 28, 1979 (44 FR 56272). Proposed rule.
D. DECEMBER 31, 1979 (44 FR 77440). Final rule.
E. APRIL 1, 1983 (48 FR 13984). Final rule; corrections. Federal Lands Program.
F. MAY 31, 1989 (54 FR 23388). Proposed rule. Federal Lands Program.
G. MARCH 13, 1990 (55 FR 9400). Final rule. Federal Lands Program.
H. JULY 12, 1991 (56 FR 32002). BLM Proposed rule. 43 CFR Group 3400: Coal Management
-- General; Coal Management Provisions and Limitations; Coal Exploration an Mining
Operations, etc.
I. IN RE: PERMANENT SURFACE MINING REGULATION LITIGATION, 21 ERC 1193, 14 ELR
20617 (D DC July 6, 1984), amended August 30, 1984.
J. IN RE: PERMANENT SURFACE MINING REGULATION LITIGATION, 22 ERC 1557 (D C
March 22, 1985).
K. NATIONAL WILDLIFE FEDERATION v HODEL, 839 F 2d 694 (DC Cir January 29, 1988).
L. 46 FR 9065 (January 28, 1981). Final rule. Operations on Federal Lands Under the
Permanent Program; State-Federal Cooperative Agreements; Wyoming. Final rule.
M. 51 FR 45082 (DECEMBER 16, 1986). State-Federal Cooperative Agreements; Wyoming.
Final rule.
N. OSM DIRECTIVE: Subject No. REG-31, Transmittal No. 584, "Preparation of Mining Plan
Decision Documents" (Issued October 24, 1989).
O. OSM DIRECTIVE: Subject No. REG-34, Transmittal No. 591, "Processing Applications for
Federal Permits" (Issued January 9, 1990).
P. OLD BEN COAL CO. v OSM, 109 IBLA 362, IBLA 88-8 (June 23, 1989).
Research conducted by: Joyce Zweben Scall