This is the Office of Surface Mining's library of COALEX Research Reports. COALEX is a database of mining and reclamation information, including the Surface Mining Law and regulations, maintained in LEXIS-NEXIS -- a commercial, on-line research service. These reports have been compiled under a cooperative agreement between the Office of Surface Mining and the Interstate Mining Compact Commission, which represents most U.S. coal producing states. The following report includes an analysis of a specific issue requested by a state regulatory authority with responsibility for carrying out the Surface Mining Law. Copies of the research reports and attachments are available to the public, upon request. For additional information, or to obtain copies of the listed attachments, contact Ron Tarquinio by phone at (202) 208-2882 or by e-mail at rtarquin@osmre.gov.
                   
COALEX State Comparison Report - 228
August, 1992

Karen Jacobs, Esquire
Illinois Department of Mines and Minerals
Land Reclamation Division
300 West Jefferson Street - Suite 300
P.O. Box 10137
Springfield, Illinois 63791-0137

TOPIC: INCIDENTAL BOUNDARY REVISIONS AND INSIGNIFICANT PERMIT REVISIONS

INQUIRY: Illinois DMM is interested in obtaining information on IMCC-member states' regulations
regarding these two topics:

1.   Incidental boundary revisions (IBRs):
     a. Is there a limit to the number of IBRs which may be issued under a single permit?
     b. Are acreage limitations imposed on IBRs?
     c. Have there been any OSM oversight concerns with the regulations or their
     implementation?

2.   Insignificant permit revisions (IPRs):
     a. Are land use changes allowed via the IPR process?
     b. If so, under what criteria are they allowed, e.g., under a certain acreage limitation?
     c. What are the differences between an insignificant and a significant permit revision?
     d. Have there been any OSM oversight concerns with the use of the IPR process for land
     use changes or with any other aspect of the implementation of these state regulations?

SURVEY RESULTS: A telephone survey of nine IMCC member states was conducted using the
questions listed above. Results of the survey follow. Copies of state statutes, regulations or
policies are attached, as indicated. Also included is a copy of COALEX State Inquiry Report - 165,
"Permit revisions; incidental boundary revisions" (1991).

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

ALABAMA
1.   IBRs
a/b. There is no limit to the number of IBRs allowed under a single permit nor are there
     acreage or percentage limits. The IBR limitations are functional, i.e., if the baseline
     information covers the area proposed to be added then the regulatory authority (RA)
     considers it an IBR. If the revision involves a new property owner, it has to be advertised.
c.   There were some OSM oversight problems several years ago, nothing recently.

2.   IPRs
a/b. Land use changes are allowed under the IPR process;however, the operator must go
     through the public notice procedure.
c.   A written policy defines when a revision is considered "incidental", "insignificant" or
     "significant".
d.   There have been no OSM oversight concerns on this issue.


INDIANA
1.   IBRs
a.   There is no limit on the number of IBRs per permit term.
b.   The additional acreage of each IBR request may not exceed 20 acres or 10% of the
     original permit area. The aggregate of all coal removal IBRs may not exceed 10% of the
     original permit area. The aggregate of all non-coal removal IBRs may not exceed 15% of
     the original area. IBRs may not be used to avoid full permit revisions.
c.   Earlier in the program there were oversight problems due to the abuse of the system.

2.   IPRs
a/b. Post-mining land use changes require an abbreviated revision process. Notice must be
     given to state agencies for their comments but public notice is not required. The appeal
     processes apply.
c.   No additional acreage may be added through the IPR process. Changes may be made to
     the operations plan, etc., provided there is no "significant impact".
d.   Earlier in the program, there were some OSM concerns as a result of public complaints. As
     a result, the relevant statute was changed and the regulations revised to better define
     different types of permit revisions.


KENTUCKY
1.   IBRs
a.   Limits do not depend on the number of IBRs applied for.
b.   The statute and regulations regarding major and minor permit revisions were revised
     about a year ago: The area included in the IBR may not exceed 10% of the permitted
     area nor exceed a maximum of 20 acres. Additional conditions apply, e.g., the area to be
     added must be contiguous, lie within the same watershed, be required for "orderly
     continuation" for mining that coal seam, have been included in the baseline information,
     etc. No IBR will be issued when there is a change in the mining method or the area is
     considered "unsuitable for mining" or is part of a historic area. The additional area must
     conform to the reclamation plan. In the event that the operator applies for and receives a
     permit amendment and existing IBRs are incorporated into the permit, the 10% or 20
     acre "clock" starts anew from zero. 
c.   There have been no OSM oversight problems with this issue.

2.   IPRS
a/b/c.    Applications for minor revisions, which do not require public advertisement, may be
          approved by state field offices. Applications for changes involving greater than 20 acres
          are considered major revisions and require public advertisement.
d.   There have been no OSM oversight problems with this issue.


MARYLAND
1.   IBRs
a.   There is no limit to the number of IBRs per permit.
b.   The IBR is limited to 250 feet from the original perimeter of the permitted area. However,
     as the total acreage permitted must not change, an equal number of acres must be
     reduced from another part of the permitted area.
c.   There have been no OSM oversight problems.

2.   IPRs
a/b/c.    There are 28 conditions listed in the regulations which are considered IPRs.
d.   There have been no OSM oversight problems.


OHIO
1.   IBRs
a.   There are no limits on the number of IBRs which may be issued under a single permit.
b.   Policy states that the limit for the IBR is 5% of the permitted area. In practice, an IBR
     limit of up to 10% may be considered, depending on the circumstances.
c.   There have been no OSM oversight problems with IBRs.

2.   IPRs
a/b. Certain kinds of land use changes may be allowed via the IPR process.
c.   The regulations list the revisions that are considered "significant"; revisions not listed are
     considered "insignificant".
d.   New policies were developed as a result of OSM oversight problems that occurred about 5
     years ago.


PENNSYLVANIA
1.   IBRs
a.   See the attached material.
b/c. Each IBR is limited to 5 acres for coal extraction; some additional acreage may be
     considered for support areas. An IBR will be considered under such conditions as a small,
     isolated area not seen at the time the original permit was approved; for survey errors, etc.
d.   There have been no OSM oversight problems.

2.   IPRs
a/b. Land use changes are not allowed via the IPR process; such changes require public
     notice.
c.   See the attached material.
d.   OSM recently reviewed Pennsylvania permit revisions and renewals. The report indicated
     that for 12 of 25 revisions an update CHIA should have been considered; some other
     revisions should have gone through the public notice process.


TEXAS
1.   IBRs
a.   There are no limits on the number of IBRs allowed under a single permit.
b.   An IBR may be issued if it is "necessary for" or will "facilitate" the mining operation, e.g.,
     for roads, sedimentation ponds, diversions, etc. An IBR may not be issued to increase the
     actual mining area. [Policy]
c.   OSM raised concerns about the size of the Texas IBRs. Texas responded that while the
     number of acres allowed in some IBRs may seem large, the percentage of the IBR was
     not because the original permitted mine area was large.

2.   IPRs
a.   Compatible land use changes are allowed under the IPR process.
b.   The criteria for these changes are broad; however, the operator must still meet all
     performance standards and there must be no "significant impact" on the environment.
     Acreage is a factor under certain revisions.
c.   The regulation lists what "significant" revisions are; by default, if the revision is not listed
     it is considered an "insignificant" revision. This is similar to the 1979 federal rule.
d.   OSM reviewed the revisions this year and determined that the regulations were broad but
     were not "arbitrary and capricious".


VIRGINIA
1.   IBRs
a.   Yes, there is a concern if more than one is requested.
b.   An IBR will be issued after an analysis of the operator's justification for the IBR, the size
     of the original permitted area, etc.
c.   There have been no OSM oversight problems.

2.   IPRs
a/b. Land use changes are not allowed via the IPR process.
d.   There have been no OSM oversight problems.


WEST VIRGINIA
1.   IBRS
a.   There are no limits to the number of IBRs allowed under a single permit.
b.   Over the life of the permit, the IBRs are limited to 20% of the original permitted acreage
     to a maximum of 50 acres.
c.   There were no OSM oversight problems.

2.   IPRs
a/b/c.    Land use changes always require public notice and are considered "significant" permit
          revisions.
d.   There have been no OSM oversight problems with this issue.


ATTACHMENTS
A.   ALABAMA:
     1.   Memorandum from Randall C. Johnson, Director, Alabama Surface Mining
          Commission, "Revised Guidelines for Revisions" (1987).
     2.   Rules of Alabama Surface Mining Commission, Sec. 880-X-8M-.06 (1982). Permit
          revisions.
B.   INDIANA:
     1.   310 IAC 12-3-121 (1986). Permit revisions; revisions and renewals, etc.
     2.   310 IAC 12-3-82 (1982). Postmining land use.
C.   KENTUCKY:
     1.   KRS Ann. Sec. 350.070 (Baldwin)(1991). Permit revisions.
     2.   405 KAR 8:010, Sec. 20 (1991). Permit revisions.
D.   MARYLAND: COMAR 08.13.09.08 (1980). Permit review and transfer of permit rights.
E.   OHIO:
     1.   Ohio Admin. Code 1501:13-4-06 (1986). Permit applications, revisions and
          renewals, etc.
     2.   Ohio Admin. code 1501: 13-9-17 (1982). Postmining use of land.

F.   PENNSYLVANIA:
     1.   Current Policy Guidelines, "Insignificant Boundary Corrections for Surface Mining
          Activities", Sec. II:02:03:1 (1986).
     2.   PADER Coal Mining Regulations, Sec. 86.54 (1989). Public notice of permit
          revision.
G.   TEXAS: Railroad Commission of Texas, Surface Coal Mining Regulations, Sec.
     051.07.04.226 (1979). Permit revisions.
H.   VIRGINIA:
     1.   Memorandum from Danny R. Brown, Commissioner, Division of Mined Land
          Reclamation, "Incidental Boundary Revision/Insignificant Permit Revision" (1992).
     2.   Virginia Surface Mining Regulations, Sec. 480-03-19.774.13 (1985). Permit
          revisions.
I.   WEST VIRGINIA:
     1.   West Virginia Surface Mining Regulations, Sec. 38-2-3 (1990). Incidental boundary
          revisions.
     2.   West Virginia Surface Mining Regulations, Sec. 38-2-7 (1986). Criteria for
          approving alternative postmining use of land.
     3.   West Virginia Surface Mining Regulations, Sec. 38-2-3  (1986). Permit revisions.
     4.   West Virginia Surface Mining Regulations, "Addendum to Permit or Significant
          Revision of a Permit".
J.   OSM DIRECTIVE, Subject No. REG-19, Transmittal No. 397, "Incidental Boundary
     Revisions" (1987).
K.   OSM DIRECTIVE, Subject No. REG-21, Transmittal No. 398, "Findings and Determinations
     for Revisions and Renewals of Federal Permits" (1987).
L.   Copies of survey conducted by IMCC for COALEX REPORT - 165.
M.   COALEX STATE INQUIRY REPORT - 165, "Permit revisions; incidental boundary revisions"
     (1991). [ONLY SURVEY RESPONSES INCLUDED - SEE ABOVE]


Survey conducted by: Joyce Zweben Scall