This is the Office of Surface Mining's library of COALEX Research Reports. COALEX is a database of mining and reclamation information, including the Surface Mining Law and regulations, maintained in LEXIS-NEXIS -- a commercial, on-line research service. These reports have been compiled under a cooperative agreement between the Office of Surface Mining and the Interstate Mining Compact Commission, which represents most U.S. coal producing states. The following report includes an analysis of a specific issue requested by a state regulatory authority with responsibility for carrying out the Surface Mining Law. Copies of the research reports and attachments are available to the public, upon request. For additional information, or to obtain copies of the listed attachments, contact Ron Tarquinio by phone at (202) 208-2882 or by e-mail at rtarquin@osmre.gov.
                   

COALEX State Comparison Report - 239
December, 1992  (Revised: February, 1993)

Ernest F. Giovannitti, Director
Bureau of Mining and Reclamation
Pennsylvania Department of Environmental Resources
209 Executive House Building
P.O. Box 8461
Harrisburg, Pennsylvania 17105-8461

TOPIC: HISTORIC AND ARCHAEOLOGIC RESOURCES

INQUIRY: What provisions have the states made to carry out the requirements of OSM
regulations 780.31(a) and (b) relative to historic and archaeological resource protection? Please
ask the IMCC member states the following questions:

1. Have you hired staff or outside contractors with expertise in historical or archaeological
resource assessment?
a.   How many?
b.   Type of expertise?
c.   What do they do?

2. Do you provide funding to your State Historic Preservation Office (SHPO) to carry out historical
or archaeological site assessment? If yes, what level of service is provided by the SHPO?

3. Do you have an interagency agreement with your SHPO relative to historic or archaeological
resource protection? If yes, please summarize respective roles and responsibilities.

4. What level of protection [avoidance, mitigation (minimize impacts), documentation (site
surveys), enhanced documentation (artifact recovery)] under your permitting and enforcement
programs is provided for the following:
a.   Historic/archaeological sites which are listed on or eligible for listing on the National
     Register of Historic Places (NRHP).
b.   Historic/archaeological sites which are known but not listed/eligible for listing on NRHP. Do
     you have criteria for defining "known" sites?
c.   Sites or areas where there is a high probability of finding archaeological resources. Do you
     have criteria for defining "high-probability" sites?

5. If a permit applicant owns the property to be mined (including the historic or archaeological
resources on the property), how does this affect the responses to question 4 above?

SURVEY RESULTS: Twelve IMCC member states, including two non-coal states, responded to the
survey. The responses to the questionnaire follow; a table summarizing the responses to
questions 1, 2, 3 and 5 appears at the end.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

ALABAMA
1. Have you hired outside staff or contractors: No. We consult with the Alabama Historical
Commission.
a.   Number of the Ala. Hist. Comm. staff: 
          1 - State Historic Preservation Officer
          1 - Chief of Administration
          5 - Professional Archaeologists
          10 - Cultural Resource Coordinators
b.   Expertise: 
c.   What do they do: Professional archaeologists review requests for evaluations and
     recommend and/or approve site assessments conducted by contracted archaeologists.
     Archaeologists also manage site owned cultural and historical sites. Cultural Resource
     Coordinators make on-ground inspections for site assessments.

2. Do you fund SHPO: No. 
Level of service provided by SHPO: N/A.

3. Do you have an interagency agreement with SHPO: No.

4. Level of protection under permitting and enforcement:
a.   Sites on NRHP: Avoidance.
b.   Criteria for defining "known" sites: Avoidance or mitigation. "Known" sites have been
     surveyed by other archaeologists or have sub-surface structures present.
c.   Criteria for defining "high-probability" sites: A Phase I Study (Cultural Assessment) is
     required. "High probability" sites are any elevated areas near a water supply, and are
     prevalent over most of the state.

5. If permit applicant owns property to be mined: The property is treated the same as any other.


ARKANSAS
1. Have you hired outside staff or contractors: No.
a.   Number: N/A.
b.   Expertise: N/A.
c.   What do they do: N/A.

2. Do you fund SHPO: No funding provided.
Level of service provided by SHPO: N/A.

3. Do you have an interagency agreement with SHPO: No.

4. Level of protection under permitting and enforcement:
a.   Sites on NRHP: Obtain approval and/or guidance from the SHPO.
b.   Criteria for defining "known" sites: No criteria for defining "known" sites.
c.   Criteria for defining "high-probability" sites: No criteria for defining "high-probability" sites;
     however, there have been cases when the SHPO has alerted the permit applicant that the
     proposed permit area is in a high-probability area. The Surface Mining and Reclamation
     Division (SMRD) required that the applicant satisfy the SHPO which resulted in an
     archaeological survey by the applicant. The applicant must provide a clearance letter from
     the SHPO in the application. If the SHPO has questions about the permit area, the
     applicant has usually cleared it by the time the permit application is submitted to the
     SMRD. It has the SMRD's experience that the applicant has proceeded with the
     archaeological survey rather than question the SHPO's request. 

5. If permit applicant owns property to be mined: The applicant must satisfy the SHPO.


ILLINOIS
1. Have you hired outside staff or contractors: No, nor have we hired anyone in-house specifically
for this purpose. However, one staff member has expertise and is utilized for cultural resource
review. 
a.   Number of in-house staff:One
b.   Expertise of in-house staff: This individual does not have formal educational training, but
     has "hands-on" experience with survey work during his tenure with a coal company.
c.   What does the in-house staff do:Primarily, respond to SHPO comments on permit
     applications and make determinations on the need for initial surveys or additional phase
     surveys.

2. Do you fund SHPO: No. SHPO receives funding through National Park Service. 
Level of service provided by SHPO:SHPO performs reviews of all permits, significant revisions and
renewals by virtue of being a member of our interagency committee.

3. Do you have an interagency agreement with SHPO: The SHPO is a member of our interagency
committee. They receive copies of all permit applications and are allowed to comment within 45
days. IDMM considers the SHPO comments prior to making its final permit decision.

4. Level of protection under permitting and enforcement:
a.   Sites on NRHP: All of the above options could be utilized. To date, most operators commit
     to survey work in lieu of avoidance. Surveys through Phase III have been required.
b.   Criteria for defining "known" sites: Our SHPO considers virtually every known site as
     potentially eligible. We have no definition of "known site".
c.   Criteria for defining "high-probability" sites: We have no definition of "high-probability"
     sites.

5. If permit applicant owns property to be mined: Has no impact. Compliance with the regulations
still required.


INDIANA
1. Have you hired outside staff or contractors: No. We use in-house staff.
a.   Number of in-house staff: Two staff members under SHPO are paid by the Division of
     Reclamation (DOR). One additional professional archaeologist is an administrator at the
     DOR.
b.   Expertise of in-house staff: Historic and prehistoric archaeologists exceed requirements of
     the Society of Professional Archaeologists for their fields.
c.   What do the in-house staff do: Review all applications, maintain database, provide
     recommendations to Director of the DOR and to industry, review compliance field work
     and reports.

2. Do you fund SHPO: The DOR funds two positions. 
Level of service provided by SHPO: SHPO provides assessments and recommendations on the
basis of information obtained from the applicant and any other available information. The
applicant must provide sufficient information to make necessary assessments. SHPO may provide
recommendations concerning the manner of which such information can be obtained.

3. Do you have an interagency agreement with SHPO: An agreement is currently being
developed, which provides for the DOR to consult with the SHPO. Determinations requiring
additional information and field work to discover unknown resources are made by the DOR as the
Department of Natural Resources (DNR) director delegate. The DNR director is also the SHPO.

4. Level of protection under permitting and enforcement:
a.   Sites on NRHP: Joint approval of any impacts must be obtained from both SHPO and DOR.
     The means of addressing those proposed impacts are specific to property and part of the
     joint approval process.
b.   Criteria for defining "known" sites: The nature of known properties must be reported by
     the applicant. SHPO will then supply a determination on eligibility. Protective measures are
     not considered for properties that are not eligible for listing. A "known" site is one which is
     recorded at one of the state's records holding institutions, recorded in the SHPO's files,
     listed in a county history, depicted on a county atlas, recorded by a county historian,
     recorded by a local historical society, depicted on county soil survey maps, reported in
     documents of the Geological Survey, etc.
c.   Criteria for defining "high-probability" sites: DOR uses the guidelines found in Federal
     Directive TSR-7. Determinations are made from analysis of settlement and subsistence
     systems identified for the region and an examination of the relationships of topography,
     soils, etc. to know sites in the region. Probabilities are determined through a comparison
     to the characteristics of the area to be permitted.

5. If permit applicant owns property to be mined: Property ownership does not affect the
requirement of the applicant to address the impacts of his operation.


KENTUCKY
1. Have you hired outside staff or contractors: No. However, the Department for Surface Mining
Reclamation and Enforcement (DSMRE) hired qualified archaeologists.  
a.   Number of in-house staff: Three.
b.   Expertise of in-house staff:
c.   What do the in-house staff do: Review permit applications and coordinate with SHPO.

2. Do you fund SHPO: Yes.

3. Do you have an interagency agreement with SHPO: Yes. DSMRE entered into a Memorandum
of Agreement (MOA) with the SHPO which includes funding. The MOA is currently being
renegotiated in its entirety. The new MOA is expected to be in place by the end of February,
1993.

4. Level of protection under permitting and enforcement: DSMRE screens all proposed permit
applications and determines on a case-by-case basis whether an initial reconnaissance survey of
the proposed permit area is required to determine whether any potentially eligible historic or
archaeological sites exist within the proposed boundaries.
a.   Sites on NRHP: A protection of mitigation plan is required for all listed and/or eligible sites.
     The scope and level of detail required for a protection and/or mitigation plan is
     determined site-by-site in consultation with the SHPO.

b.   Criteria for defining "known" sites: 
c.   Criteria for defining "high-probability" sites: If potentially eligible sites exist, the applicant
     is required to do further studies to determine whether the site is eligible. 

5. If permit applicant owns property to be mined: Ownership of the property has no impact on
how applicant addresses historic or archaeologic sites prior to mining.


MISSOURI
1. Have you hired outside staff or contractors: No. 
a.   Number: N/A.
b.   Expertise: N/A.
c.   What do they do: N/A.

2. Do you fund SHPO: No. 
Level of service provided by SHPO: The assessments are performed by private consultants hired
by applicants. The SHPO only reviews the report and issues its findings.

3. Do you have an interagency agreement with SHPO: No formal agreement. However, SHPO
understands its role as the final authority on the adequacy of the permit application.

4. Level of protection under permitting and enforcement: Missouri requires all applicants to
coordinate with SHPO and DNR. No permits are issued until SHPO approves.
a.   Sites on NRHP: Avoidance, or if that is not possible, a mitigation plan which meets the
     approval of the SHPO.
b.   Criteria for defining "known" sites: Site survey may be required if SHPO is not comfortable
     with available information.
c.   Criteria for defining "high-probability" sites: The SHPO determines the criteria. Surveys are
     usually required where a "high-probability" exists.

5. If permit applicant owns property to be mined: Does not affect the level of protection.


OHIO
Ohio Division of Reclamation (DOR) has promulgated rules and regulations on historic
preservation/protection as effective as OSM regulations for surface, underground mining, and
AML reclamation projects.

1. Have you hired outside staff or contractors: Ohio DOR hired a permanent full-time professional
archaeologist in 1986. Applicants hire professional prehistoric and historic archaeologists
(contracting firms) as well as historic architects to perform the Phase 1 (literature search), Phase
2 (field locational investigation), Phase 3 (historic property eligibility assessment), Phase 4
(mitigation) surveys when the DOR archaeologist requires historic/archaeological investigations.
The DOR archaeologist and contracting archaeologists are qualified per the (1983) Secretary of
Interior's Standards (for qualifications) and Guidelines (for survey reports). DOR AML projects also
contract with professional archaeology firms to perform the Phase 1-4 surveys after the DOR
archaeologist reviews them, if surveys are necessary.
a.   Number of in-house staff: Ohio DOR has one professional archaeologist.
b.   Expertise of in-house staff: Ohio DOR staff archaeologist has a Ph.D. in North American
     Prehistoric and Historic Archaeology with expertise in Ohio Valley and Columbia Plateau
     (Northwest America) archaeology and ethnohistory. The archaeologist has over 20 years
     of professional experience in the discipline, including, a decade of college and university
     teaching, six years with Ohio DOR, and two years as tribal archaeologist, Calville
     Reservation, Washington State. The Ohio DOR archaeologist has had his dissertation
     published, as well as numerous articles.
c.   What do the in-house staff do: Ohio DOR archaeologist researches, writes, and
     implements, historic preservation rules and regulations for surface, underground, AML
     reclamation, AML emergency and state no-cost AML projects. The archaeologist is
     charged with administering the archaeology program for all regulatory and AML projects.
     The archaeologist is in daily contact with SHPO on various projects, MOU's, mitigation
     strategies, program/policy procedure amendments, and technical matters. The
     archaeologist performs research at the Ohio Historical Society and county historical
     societies as well as on-site reviews, as necessary, to clear or delineate those survey areas
     that are "archaeologically sensitive". The archaeologist holds training sessions for DOR
     staff, contacting archaeologists and industry on various aspects of archaeology. He also is
     the facilitator of the Taskforce to reduce the costs of archaeology surveys for industry and
     obtain funding for the experiment to determine the effects of subsidence on subsurface
     archaeology sites in order to create an MOU on full coal recovery areas. The archaeologist
     also attends and participates in several professional meetings and OSM and Advisory
     Council Training courses conducted annually. In addition to several other duties, the DOR
     archaeologist conducts on-site meetings between DOR, SHPO, OSM (as necessary),
     contracting archaeologists and applicants on all Phase 4 mitigation projects (with an
     impressive record in cutting costs to applicants). The DOR archaeologist does not perform
     any surveys himself given the magnitude of his duties and responsibilities (not all of which
     are mentioned here).

2. Do you fund SHPO: Ohio DOR does not provide any funding to SHPO. 
Level of service provided by SHPO: Ohio SHPO is afforded comment on all surface and
underground projects, provides technical assistance when required, and signs off on all AML
federal (Section 106 NHPA) projects.

3. Do you have an interagency agreement with SHPO: Ohio DOR does have MOU's with SHPO for
regulatory and AML archaeology programs. These MOU's are in the process of being updated and
revised. Briefly, SHPO is afforded comment on all aspects of archaeology throughout the
permitting process for all surface and underground operations. SHPO is provided with a copy of
the Attachment 27 (surface) or 27A (underground) which contains archaeology related and
project area data as well as a copy of the application map. SHPO provides comment within the 30
day comment period recommending clearance of a Phase I or II survey. Ohio DOR archaeologist
performs research as described in #1c above. DOR informs the applicant the area is cleared of a
full or partial survey is necessary. The applicant hires qualified archaeologists to perform the
work, and both applicant and archaeologists are in routine communications with the DOR
archaeologist who then review the survey reports and sends one copy to SHPO for their
comment. If SHPO recommends additional investigation, the applicant may avoid the
archaeological site and receive a conditional permit issuance or perform a high level survey, the
scope of which is determined by the DOR archaeologist.

AML projects follow the same process except the DOR archaeologist does not have the final word,
SHPO does (SMCRA archaeology regulations vs NHPA Section 106, 110 law).

4. Level of protection under permitting and enforcement:
a.   Sites on NRHP: Ohio DOR, to date, has not dealt with a listed NRHP property on a surface,
     underground or AML mining operation. If, however, a listed property is encountered SHPO
     would be involved through comment, review of any mitigation plans, on-site meetings,
     etc. Any eligible NRHP property within a surface or surface affected underground
     application area is treated as follows: the applicant is given the option to avoid the eligible
     property with the boundaries flagged, and permit issuance conditioned, or if avoidance is
     not possible (usually due to economic reasons), the applicant must have a Phase 4
     (mitigation) survey performed by qualified professionals after the DOR archaeologist and
     SHPO review and approve (usually with substantial realistic modifications) the mitigation
     plan. Mitigation on underground full coal recovery areas only applies to eligible standing
     historic structures. No archaeological surveys are currently performed on full coal recovery
     areas, except where surface impacts would occur. All AML archaeology projects fall under
     NHPA Section 106 and 110.
b.   Criteria for defining "known" sites: In the Ohio DOR application, an Attachment 27 and
     27A, is sent to SHPO for review. One part requires SHPO to list all known sites within a 1.5
     mile radius of the project area. Ohio DOR field staff also inform the archaeologist of
     obvious sites while performing reviews. Known sites usually have not had Phase 3
     eligibility assessment studies performed on them. Ohio DOR provides the applicant, early
     in the application process, with the option of avoiding the known sites. If this is not
     possible then the applicant has the option of documenting the site (if known but not
     documented) to save money or contracting qualified archaeologists to document and
     assess the site's eligibility status. Criteria for a known site include previous documentation
     of a site filed at the SHPO, a site discovered during research or on-site reviews by the
     archaeologist of field staff, or a site brought to DOR of SHPO's attention by a local
     landowner collector or other public avenue.
c.   Criteria for defining "high-probability" sites: SHPO comment on a project area usually
     identifies those areas likely to be "archaeologically sensitive". The DOR archaeologist then
     performs research (literature and on-site reviews) to specifically clear or delineate survey
     areas since the date sent to SHPO, specifically the application map, fails to identify all
     types of disturbance within the project area (drill roads, primary, and secondary effects
     from previous mining, clearcut logging, etc.) Criteria used by the DOR archaeologist to
     identify "high probability" sites include disturbance to an area, topographic setting in
     relationship to other known and eligible sites, geological strata on steep slopes (conducive
     to rock over-hang/shelter formation), visibility (degree of site alteration), focus (quantity
     and quality of artifactual remains), on-site review, etc.

5. If permit applicant owns property to be mined: For Ohio DOR, if the applicant owns the project
area, including the archaeological resources, he/she has to follow the procedure identified in #4
above. Ohio DOR does not make a distinction since the SMCRA archaeology rules and regulations
do not make any distinction. The applicant must abide by the rules and regulations whether for
archaeology, hydrology, blasting, etc. if he/she owns the project area or is leasing it form private
landowners. There has not been one instance the DOR archaeologist is aware of (since he began
in 1986 where an applicant has refused to do an archaeological survey when required regardless
of whether the applicant owner the project area or was leasing it.


NORTH CAROLINA (Non-Coal)
1. Have you hired outside staff or contractors: No. North Carolina Department of Environment,
Health and Natural Resources routes copies of the application to the North Carolina Division of
Archives and History, Department of Cultural Resources.
a.   Number: N/A.
b.   Expertise: N/A.
c.   What do they do: They perform site inspections and comment as to whether there is a
     high probability for archaeological resources.

2. Do you fund SHPO: No. They have their own funding.
Level of service provided by SHPO: N/A.

3. Do you have an interagency agreement with SHPO: We have a cooperative agreement to
advise them of all new/proposed mine sites; then if the potential is high for archaeological
resources, they contact the operator directly and handle the situation from there.

4. Level of protection under permitting and enforcement:
a.   Sites on NRHP: We adjust blasting limits and buffer zone widths when these structures
     are in close proximity to a mine.
b.   Criteria for defining "known" sites: Department of Cultural Resources does this and
     maintains an inventory.
c.   Criteria for defining "high-probability" sites: Department of Cultural Resources is
     responsible for this.

5. If permit applicant owns property to be mined: Conditions of the permit are still adjusted no
matter who owns/operates the mine.


PENNSYLVANIA
1. Have you hired outside staff or contractors: No.
a.   Number: N/A.
b.   Expertise: N/A.
c.   What do they do: N/A.

2. Do you fund SHPO: Yes. 
Level of service provided by SHPO: Through a coordinated review process, the SHPO identifies if
known historic or archaeologic resources exist or if there is a high probability of these resources
existing.

3. Do you have an interagency agreement with SHPO: Pennsylvania is currently in process of
developing an agreement.

4. Level of protection under permitting and enforcement:
a.   Sites on NRHP: Avoidance and mitigation.
b.   Criteria for defining "known" sites: SHPO usually asks for avoidance/mitigation. SHPO and
     the applicant communicate directly to work things out. There is no criteria for defining
     "known" sites.
c.   Criteria for defining "high-probability" sites: SHPO utilizing model to determine if a specific
     site has a high probability of containing archaeological resources. SHPO usually asks for a
     site survey. SHPO and applicant communicate directly to work things out.

5. If permit applicant owns property to be mined: Same level of protection provided except permit
applicant and SHPO are usually more amenable to mitigation.


SOUTH CAROLINA (Non-Coal)
1. Have you hired outside staff or contractors: State has required third-party consultants to be
retained by operator to conduct archaeological surveys.
a.   Number: 3-4
b.   Expertise: Specific expertise in conducting detailed archaeological surveys, mapping
     artifacts, and developing mitigation procedures.
c.   What do they do: See b. above.

2. Do you fund SHPO: N/A.
Level of service provided by SHPO: N/A.

3. Do you have an interagency agreement with SHPO: N/A.

4. Level of protection under permitting and enforcement:
a.   Sites on NRHP: Operators are required to propose and implement methods to limit
     significant adverse effects on significant cultural or historic sites.
b.   Criteria for defining "known" sites: If sites are not considered eligible for listing, they
     generally are not considered "significant" for protection pursuant to the Mining Act.
c.   Criteria for defining "high-probability" sites: The South Carolina Land Resources
     Commission relies on the expertise and comments of the South Carolina Department of
     Archives and History to determine high-probability sites - generally investigate tracts
     greater than 50 acres.

5. If permit applicant owns property to be mined: From a permitting perspective, ownership vs
leasing is not a factor for consideration. All requirements pursuant to the South Carolina Mining
Act apply to all mine sites.


VIRGINIA
1. Have you hired outside staff or contractors: Yes.
a.   Number: Two.
b.   Expertise: Consulting Engineering firm subcontracts to archaeologist listed by the SHPO to
     investigate AML projects.
c.   What do they do: Conduct Phase I archaeological surveys and evaluate potential for
     historic significance.

2. Do you fund SHPO: No.
Level of service provided by SHPO: N/A.

3. Do you have an interagency agreement with SHPO: Virginia is currently in the process of
developing an interagency agreement with the SHPO.

4. Level of protection under permitting and enforcement:
a.   Sites on NRHP: SHPO would determine potential impact and recommend action regarding
     historic/archaeological site.
b.   Criteria for defining "known" sites: Provided by consultation with SHPO.
c.   Criteria for defining "high-probability" sites: Evaluation may be conducted by an
     archaeologist. No specific criteria.

5. If permit applicant owns property to be mined: Ownership of the property including the historic
or archaeological resources on the property does not have any effect on the responses to
Question 4 above.


WEST VIRGINIA
1. Have you hired outside staff or contractors: No. (See below.)
a.   Number: N/A.
b.   Expertise: N/A.
c.   What do they do: N/A.

2. Do you fund SHPO: Our agency has proposed the funding of two positions for the WV SHPO.
Details concerning the type and level of service provided have not been finalized.
Level of service provided by SHPO: N/A.

3. Do you have an interagency agreement with SHPO: WVDEP is in the process of finalizing an
agreement with the SHPO which will detail both agencies' roles and responsibilities.

4. Level of protection under permitting and enforcement: The West Virginia Division of
Environmental Protection's current procedures require the applicant to notify the WV SHPO of
their proposed mining operation by submitting appropriate maps and a description of the
operation. SHPO, in turn, reviews the proposal to identify known or probable historic or
archaeological sites and issues a recommendation based on their findings. This recommendation
may range from requiring a detailed site survey by an approved archaeologist, to not requiring
any further information. The WVDEP requires the applicant to comply with the SHPO's request,
which may include protection, documentation, or artifact recovery, before a mining permit is
issued.

In some cases, the SHPO is not specific as to what they are looking for, resulting in detailed site
surveys being prepared on the entire proposed area. This is expensive for the applicant and tends
to delay the final review and processing of an application. 

a.   Sites on NRHP: 
b.   Criteria for defining "known" sites: 
c.   Criteria for defining "high-probability" sites:
     
5. If permit applicant owns property to be mined: This has no effect on permitting and
enforcement.


TABLE OF RESPONSES (Reformatted from original)

ALABAMA
Hire Staff/Contractor
     Outside: No
     In-house: No
     Other Dept.:
Fund SHPO: Yes 
Interagency Agreement (MOA): No MOA
Landowner follows same rules: Yes


ARKANSAS
Hire Staff/Contractor
     Outside: No
     In-house: No
     Other Dept.:
Fund SHPO: No
Interagency Agreement (MOA): No MOA
Landowner follows same rules: Yes


ILLINOIS
Hire Staff/Contractor
     Outside: No
     In-house: Yes (1)
     Other Dept.: 
Fund SHPO: No
Interagency Agreement (MOA): No MOA but work together
Landowner follows same rules: Yes


INDIANA
Hire Staff/Contractor
     Outside: No
     In-house: Yes (2)
     Other Dept.:
Fund SHPO: Yes
Interagency Agreement (MOA): MOA being developed
Landowner follows same rules: Yes


KENTUCKY
Hire Staff/Contractor
     Outside: No
     In-house: Yes (3)
     Other Dept.:
Fund SHPO: Yes
Interagency Agreement (MOA): Have MOA
Landowner follows same rules: Yes


MISSOURI
Hire Staff/Contractor
     Outside: No
     In-house: No
     Other Dept.:
Fund SHPO: No
Interagency Agreement (MOA): No MOA but work together
Landowner follows same rules: Yes


OHIO
Hire Staff/Contractor
     Outside: No
     In-house: Yes (1)
     Other Dept.:
Fund SHPO: No
Interagency Agreement (MOA): Have MOA
Landowner follows same rules: Yes


NORTH CAROLINA
Hire Staff/Contractor
     Outside: No
     In-house: No
     Other Dept.: Yes
Fund SHPO: No
Interagency Agreement (MOA): Have MOA
Landowner follows same rules: Yes


PENNSYLVANIA
Hire Staff/Contractor
     Outside: No
     In-house:
     Other Dept.:
Fund SHPO: Yes
Interagency Agreement (MOA): MOA being developed
Landowner follows same rules: Yes


SOUTH CAROLINA
Hire Staff/Contractor
     Outside: Yes*
     In-house:
     Other Dept.:
Fund SHPO:
Interagency Agreement (MOA): MOA being developed
Landowner follows same rules: Yes

* Outside contractors are hired by applicants.


VIRGINIA
Hire Staff/Contractor
     Outside: Yes
     In-house:
     Other Dept.:
Fund SHPO: No
Interagency Agreement (MOA): MOA being developed
Landowner follows same rules: Yes


WEST VIRGINIA
Hire Staff/Contractor
     Outside: No
     In-house:
     Other Dept.:
Fund SHPO: No**
Interagency Agreement (MOA): MOA being developed
Landowner follows same rules: Yes

** WVDEP is considering funding two positions.


Survey conducted by: IMCC and Joyce Zweben Scall