                        Table of Contents


Introduction 

Part A - Performance Measures and Oversight Topic
     I.   Performance Measures
     II.  Oversight Topics
     III.      Other Oversight Study 
     IV.  Oversight Inspections

Part B - Colorado Internal Reviews in Lieu of OSM Oversight Studies

Part C - Pending Colorado Program Oversight Studies

Part D - Transfer of State Program Information 

Part E - Public Participation

Part F - Signatures

Introduction

The following five parts include specific topics, goals, performance measures, and inspections for
the conduct of oversight for 1998.  Oversight will be largely spearheaded, directed and reported by
the Colorado Oversight team.  This team includes representatives of the Colorado Division of
Minerals and Geology (DMG) and the Office of Surface Mining Reclamation and Enforcement
(OSM), Denver Field Division (DFD).  Oversight and team activities will be conducted within the
framework created and agreed to in the "Oversight Agreement" signed February 7, 1996, as a multi
year agreement.

The 1998 evaluation year (EY) will commence on October 1, 1997, and extend through September
30, 1998.  This agreement refers to oversight to be conducted in EY98.

Part A - Performance Measures and Oversight Topics

I.   Performance Measures

     OSM, in its September 30, 1997, Directive REG-8, "Oversight of State Regulatory
     Programs" document, has prescribed a method for reporting information gleaned from its
     oversight program.  With the exceptions noted in Sections A through B below, the 1998
     Colorado Annual Evaluation Report will follow that format.  The Colorado Oversight Team
     has agreed that for a more accurate reporting of Colorado activities, some changes to the
     REG-8 format are required in the form of supplemental tables to the annual report as
     described in Section B below.

     A.   Off-Site Impacts

     An off-site impact will be determined to be mitigated when the applicable enforcement
     action has been terminated and the abatement completed as mandated by DMG.  In order for
     OSM to verify that an impact has been mitigated, a representative of OSM may accompany
     the DMG inspector on any follow up inspection for enforcement actions citing off-site
     impact.  This process will be organized as follows:

          Step 1 -  DMG inspector identifies problems, issues enforcement action.
          Step 2 -  DMG Senior Environmental Protection Specialist (Senior) reviews
                    enforcement action, determines whether off-site impact has occurred.
          Step 3 -  If the Senior determines that there has been no off-site impact
                    (negative determination), OSM will not be directly involved.  If there
                    is a positive determination, he or she notifies OSM.
          Step 4 -  DMG notifies OSM of upcoming inspection for termination of
                    enforcement action. OSM may accompany inspectors.

     OSM may accompany the DMG on the follow-up inspection or review DMG's determination
     of whether the problem has been abated.  If OSM accompanies DMG on the follow-up
     inspection, they would be present for only the portion of the inspection that pertains to the
     enforcement action, and would not conduct oversight of the entire inspection.

     OSM will observe DMG's determination of whether or not the impact has been mitigated as
     directed in the enforcement action issued by DMG.  The type and degree of impact would
     be derived from DMG's notice of violation, inspection report, and documentation of the
     assessment of any civil penalty.

     Should OSM have questions or concerns regarding the prescribed abatement or with DMG's
     termination of the enforcement action, resolution would occur as described in the "Part V -
     Resolving Issues" section of the Oversight Agreement.  OSM would not initiate federal
     enforcement without first affording DMG every possible opportunity to resolve the problem. 
     Conflicts between DMG and OSM will not take place in the presence of the operator, nor
     would the OSM representative direct the operator to perform abatement other than that
     required by DMG.

     The value for "Total number of observations made to evaluate mine sites or permits for 
      off-site impacts" on the lower portion of Table 4 will include the total number of DMG complete
     inspections, special focus inspections concentrating on off-site impact, Notices of Violation
     for off-site impact, citizens' complaints alleging off-site impact, and other inspections which
     assess off-site impact during EY98.  The Team will decide, at its quarterly meetings, which
     other inspections should be included in the number of observations.  Other inspections might
     include bond release inspections or citizen complaints directed to OSM.

     B.   Additional Tables for the Annual Report

     The team will prepare additional tables, as it deems necessary, to more accurately describe
     the Colorado program  for the annual report.  One additional table will include the total
     number of acres disturbed, backfilled, graded, topsoil replaced, and seeded in the prior year. 
     Since operators do not always apply for bond releases as reclamation is completed, tracking
     of bond releases alone is not an accurate measure of the success of the Colorado program. 
     Tracking the progress of reclamation will allow for an additional measure of Colorado's
     success. 

     This information does not become available to DMG until after February of each year, and
     will be provided to OSM as soon as it becomes available.  DMG will provide the table in
     final, electronic form to facilitate OSM including it in the report.  The 1998 report will reflect
     reclamation completed during the calendar year 1997.

     Another additional table will provide information on the status of reclamation of forfeited
     sites.  Tables now required by REG-8 track only those sites where reclamation is complete. 
     If a site were forfeited in a given year, and the reclamation initiated but not yet complete, the
     table would not show any reclamation activity for that year.  A number of the sites in
     Colorado have required more than one season to complete reclamation.  To report
     reclamation activity each year, it is necessary to include an additional table which would
     include the site name, reclamation work completed during the evaluation year, cumulative
     reclamation work completed, initial funds amount, funds expended during the evaluation
     year, cumulative fund expenditures, and remaining funds.

II.  Oversight Topics

     Of the potential performance measures and oversight topics which are listed in Part III,
     Section D of the February 6, 1996 Oversight Agreement, the following have been selected
     for EY98.  The definitions included with each topic are provided only to define the limits of
     review and to define the goal for which DMG will have been deemed successful in its
          program implementation.

     A.  Prevention of Off-Site Impacts

          1.  Roads

          Haul roads outside of a sedimentation pond network typically found at most mining
          operations have the potential to cause high amounts of sediment to be discharged
          from the haul road locations.  Haul roads that will be the subject of this special focus
          review will be those roads that have drainage leaving an area which does not report
          to a sedimentation pond.    The review will concentrate only on the hydrologic
          consequences of haul roads.  Actual discharge from the road may or may not be
          observed during this review.  Designs of haul road drainage structures will not be
          analyzed as a part of this review unless field conditions indicate a failure of the
          structure.

          The focus of this topic will be to determine how effectively DMG is implementing
          its approved program to prevent off-site impacts associated with road construction
          and maintenance.  For the purpose of this review, off-site is considered to be the area
          undisturbed by mining operations adjacent to, and down slope from, the selected
          road.  Road construction and maintenance requirements are found in Sections 4.03
          and 4.17 of the Rules and Regulations of the Colorado Mined Land Reclamation
          Board for Coal Mining (Rules).

          Definition of Off-Site Impacts:

          The construction, maintenance, and post-mining conditions of  roads into and across
          the site of operations will control or prevent erosion and siltation, pollution of water,
          and damage to public or private property.  To the extent possible using the best
          technology currently available, haul roads shall not cause damage to fish, wildlife,
          and related environmental values and shall not cause additional contributions of
          suspended solids to streamflow or to runoff outside the permit area.  Any such
          contributions shall not be in excess of limitations of State or Federal laws. 

          Measurement:

          A determination of no off-site impact is made when the oversight team can determine
          that the construction and maintenance of the road under review has controlled or
          prevented the conditions listed in the definition above.  An off-site impact would
          only be identified if a road violation has an impact on the values listed above.  Road
          performance standard violations that do not affect a value listed above will not be
          considered an off-site impact.  

          Sample Population:

          Three operations for this special focus were selected based on the size and extent of
          roads, type of operation, and location.  The inspections will be unannounced.        

          Schedule for Review

          This special focus will be conducted during the EY98 review period.


           2.  Blasting

          This blasting special focus was conducted and completed during the last evaluation
          period.  The team believes that doing this special focus again would be worthwhile
          since last year's review of this topic identified certain parts of mine blasting
          programs where DMG and OSM were able to obtain improved operating methods. 
          Last year's review of this topic did identify one condition that resulted in an
          enforcement action.  The condition did not result in an off-site impact, however.
          
          Each operation has an approved blasting plan designed to prevent off-site impacts. 
          The focus of this topic will be to determine how effectively DMG is implementing
          its approved program to prevent off-site impacts attendant to blasting operations. 
          Blasting requirements subject to this review are defined in Sections 4.08.1, 4.08.2,
          4.08.4, 4.08.5, and 4.08.6 of the Rules and Regulations of the Colorado Mined Land
          Reclamation Board for Coal Mining (Rules).

          Definition of Off-Site Impacts:

          Blasting shall be conducted to prevent injury to persons, damage to public or private
          property outside the permit area, adverse impacts to underground mine workings, and
          change in the course, channel, or availability of surface or ground waters outside the
          permit area.  Exceedances of airblast and ground vibration limitations are not in and
          of  themselves off-site impacts; however, exceedances are recognized as an indicator
          of increased potential for off-site impacts.  Flyrock, including blasted material
          traveling along the ground, that extends beyond the permit boundary or beyond the
          line of property owned or leased by the permittee will be considered an off-site
          impact.

          Measurement:

          A determination of no off-site impact will be made when the oversight team can
          determine that the operation, during the evaluation year, has been conducting blasting
          operations to prevent the conditions listed in the definition above.  In order to
          ascertain that there are no off-site impacts from a blasting operation, the team will
          verify the following:

               *    The operator is conducting all of the required monitoring.

               *    Complete blasting records are generated for each blast.

               *    Flyrock is not evident beyond the specified areas.

               *    There are no patterns of airblast or ground vibration exceedances.

          The team, including any ad hoc members, will jointly develop a review procedure for
          each site prior to commencing the review.  Off-site structure surveys will not be
          conducted as a course of this review.  Unannounced airblast and ground vibration
          monitoring will be conducted by the team.

          DMG and/or the operator, at DMG's discretion, will develop and implement a plan
          for remediation of any blasting operations where it has been determined that
          detrimental off-site impacts have occurred or are likely to occur.

          Sample Population:

          Three mine sites where active blasting operations are occurring have been selected. 
          The inspections will be unannounced to ensure unbiased seismic monitoring.

          Schedule for Review:

          This special focus review will be conducted during the EY98 review period.  Blasting
          records reviewed will be for the twelve month period prior to the inspection.


     B.  Reclamation Success - Phase I Bond Release

          The focus will be to determine how effectively DMG is implementing its approved
          program to ensure successful reclamation in that mining operations are being
          backfilled and regraded in accordance with approved plans.

          Each operation has an approved postmining topography as part of the reclamation
          plan.  The map and plan indicate the post-mining contours, elevations, and landscape
          characteristics including maximum allowable slopes, the density, location and size
          of any reconstructed watersheds, and the approved post-mining drainage plan.  The
          approved maps and plans will be the basis for comparison in determining the success
          of reclamation at a given site.

          Definition of Successful Reclamation for Phase I Bond Release:

          The permittee has successfully completed backfilling, regrading, and drainage control
          in accordance with the approved reclamation plan.
               
          Measurement:

          A determination of successful reclamation is made when DMG can determine that 
          areas which have been backfilled and regraded are in accordance with the approved
          plan.  Methods for determining success may include the following:

          *    Comparing a topographic map of the reclaimed topography, based on aerial
               photography or land survey, to a map of the approved postmining topography.

          *    Surveying slopes on the site and comparing the results to slopes measured on
               the postmining topography map.

          *    On site visual comparison of the reclaimed area to the postmining topography
               map.

          *    Comparison of aerial photographs to the postmining topography map.

          *    Measurement of gradients, dimensions, verification of appropriate channel
               lining (if required), and observations of the general condition and density of
               reconstructed watersheds.

          *    Review of previous DMG Bond Compliance Inspections which verified
               backfilling and grading and drainage reconstruction in accordance with the
               approved post-mining topography.

          *    On site verification that all roads have been reclaimed in accordance with the
               approved plan, or that any remaining roads are approved for permanent
               retention.

          *    On site verification that all structures have been demolished in accordance
               with the approved plan, or that any remaining structures are approved for
               permanent retention.

          *    Review of final certification documents for excess spoil fills or refuse piles.

          *    Review of any slope stability monitoring being conducted.
          
          Sample Population:

          The Team will review three of the Phase I Bond Release applications received during
          the evaluation year. 

          Schedule for Review:

          This special focus review will be conducted during the EY98 review period. 
          However, if less than three Phase I applications are received, review of this topic will
          continue into the 1999 evaluation year.


     C.  Public Participation - Bond Release

          Each operation requesting a bond release is required to provide notification of such
          request to the public in a specific manner.  Persons having an interest in the bond
          release may also be allowed access to the permit area for the purpose of gathering
          information relevant to the release request and those persons with a valid legal
          interest which might be adversely affected by release of the bond have the right to file
          written objections.  Those persons filing written comments or objections may also
          request an informal conference to resolve the issues.  These requirements are found
          in Section 3.03.2 of the Colorado Rules.

          Definition of Public Participation - Bond Release

          Each operation requesting a bond release is required to provide public notification 
          of each request through publication in a newspaper of local circulation and written
          notice to adjoining property owners, surface owners, appropriate local government
          bodies, municipalities, regional planning commissions, boards of county
          commissioners, county planning agencies, sewage and water treatment authorities,
          and water conservancy and water conservation districts in the locality in which the
          mining operations took place.  DMG is also required to notify landowners of pending
          bond release inspections, and advertise a public notice of proposed bond release
          decisions.

          Measurement

          A determination can be made that the public was afforded opportunity for input when
          the team can determine that:

          À"À operators and DMG have published notification in a newspaper as required,

          À"À operators and DMG have provided written notification to all parties as
               required.


          Sample Population

          The team will study all operations that have submitted a bond release application for
          which DMG has issued a proposed decision during the period October 1, 1997
          through June 30, 1998.


          Schedule for Review

          The review will be conducted and finalized during this evaluation year.


III.      Other Oversight Study - Permit Stipulations

     Part III.C. of the February 6, 1996 Oversight Agreement between DMG and DFD allows the
     Team to conduct special in-depth studies which the Team has agreed are critical to successful
     implementation of selected areas of Colorado's program.  During the planning phase of the
     1998 Evaluation Year, DFD raised concerns, based on an Interior Board of Land Appeals
     case, No. 83-575, about some of the stipulations DMG had placed on decisions to approve
     various permitting actions.  DFD proposed that the Team evaluate the appropriateness of
     stipulations DMG imposes during  EY 98.  The Team agreed that review of this topic is
     appropriate.

     Purpose:

     The purpose of the review will be to determine whether or not the stipulations DMG places
     on permitting decisions are appropriate.  Generally, a stipulation will be deemed appropriate
     when it can be determined that the stipulation does not circumvent the requirements to
     provide certain information, plans, and/or data described in the Rules and which are required
     to be included in a complete application for a new permit, permit renewal, or revision to a
     permit .

     Criteria:

     Prior to embarking on the review, the Team will mutually agree upon more specific criteria
     based on Colorado's regulations and any legal guidance available from past court rulings
     which are identified by the Team and agreed to be relevant.  Stipulations imposed in 1997
     will be reviewed to assist in the determination of the criteria.  

     Method of Review:

     The Team will review all stipulations imposed by DMG, through the first nine months of the
     evaluation year.  Each stipulation will be judged against the criteria outlined above.  If the
     Team finds that the stipulation is appropriate, no further action will be required.  If the
     stipulation is deemed inappropriate by the Team, it will be reported as described below.

     Reporting:

     The Team will generate a report of its findings.  Included in the report will be:

     *    a description of the review methodology and criteria,

     *    a summary of the sample size and type (administrative, hydrology, vegetation,
          compliance information, etc.) of the stipulations which were reviewed,

     *    the total number of stipulations which were found to be appropriate and inappropriate
          by type,

     *    a description of any stipulations which were found to be inappropriate, to include:
          -    the reason the stipulation was deemed inappropriate,
          -    the current status of the stipulation,
          -    a description of any mitigation deemed necessary to correct the inappropriate
               stipulation,

     *    recommendations of the Team to ensure that future stipulations are issued in
          accordance with the criteria  set forth in the review,

     *    a timetable for implementation of the Team's recommendations.

IV.  Oversight Inspections

     In addition to the special focus inspections described above, OSM will conduct oversight on
     five DMG complete inspections.  The five inspections will be a sample of sites remaining
     after the exclusion of sites to be visited under a special focus and sites for which the bond
     has been forfeited.  The selection of those five sites will be carried out collectively by the
          Colorado Oversight Team.    Part B - Colorado Internal Reviews in Lieu of OSM Oversight Studies



DMG will not conduct internal reviews this year given the scope of oversight topics and inspections
selected.

       Part C - Pending Colorado Program Oversight Studies

All special focus topics analyzed during EY97 have been completed.  There are no pending studies.

          Part D - Transfer of State Program Information


The steps to be taken during development of the process have been/will be as follows:

     1.   DMG has migrated to a new system.  Migration planning and programming have
          included a function to allow electronic transfer of program data.  Programming is
          underway to  create the desired function in the new database.  In late 1995 DMG
          received a draft copy of the "Core Data Set" which OSM in currently interested in
          receiving on a regular basis.  This new data set is not entirely included in the previous
          data set.  Some additional data which the OSM now desires can be easily included
          in the current programming structure.  Others could not be easily included. Therefore,
          DMG, will have to conduct some additional re-programming in order to begin to
          capture the remainder of the data elements.
     2.   Testing of the data function will take place once the new system is in place.
     3.   Electronic data will be transmitted to DFD along with hard copies of program
          information for a period of three months, if appropriate, to allow DFD to conduct
          necessary quality checks.
     4.   Any discrepancies in the quality of electronic data will be attended to and corrected.
     5.   DMG will conduct re-programming in order to capture outstanding data elements
          which could not be included in the initial programming effort.

                  Part E - Public Participation

The Team organized and conducted public outreach meetings to notify the public and solicit public
participation regarding the 1998 Evaluation Year Oversight Plan.  In addition to advertising the
public meetings in a newspaper of state-wide distribution, approximately 125 letters were sent to
industry, consultants, environmental groups, and citizens.  None of the people that attended the
meetings were concerned coal field citizens or representatives of an environmental group.  DMG and
OSM will again hold public meetings to solicit comments for next evaluation year's agreement,
however, the team will discuss other methods by which the public can provide comments regarding
oversight and program implementation.

OSM will post legal notice in a newspaper of state-wide distribution announcing completion of the
EY97 Annual Report and  EY98 Oversight Agreement.  The notice will inform the public where they
may get copies of these documents and encourage public participation in the oversight process.

                       Part F - Signatures

Representing the Colorado Department of Natural Resources, Division of Minerals and Geology, and
the Office of Surface Mining Reclamation and Enforcement, Denver Field Division, the following
parties agree to the purpose, goals, and anticipated actions proposed in this Attachment to Oversight
Agreement.  This agreement can be nullified and/or modified at any time based on the agreement of
the parties.



Susan J. McCannon                                            Date
Coal Program Supervisor
Division of Minerals and Geology
Colorado Department of Natural Resources





James F. Fulton                                              Date
Director
Denver Field Division
Office of Surface Mining Reclamation and Enforcement


(Home Page)

Office of Surface Mining
1951 Constitution Ave. N.W.
Washington, D.C. 20240
202-208-2719
getinfo@osmre.gov