SECTION 507 - APPLICATION REQUIREMENTS
§ 507(b)(11) a determination of the probable hydrologic consequences of the mining and reclamation operations, both on and off the mine site, with respect to the hydrologic regime, quantity and quality of water in surface and ground water systems including the dissolved and suspended solids under seasonal flow conditions and the collection of sufficient data for the mine site and surrounding areas so that an assessment can be made by the regulatory authority of the probable cumulative impacts of all anticipated mining in the area upon the hydrology of the area and particularly upon the water availability: Provided, however, that this determination shall not be required until such time as hydrologic information on the general area prior to mining is made available from an appropriate Federal or State agency: Provided further, that the permit shall not be approved until such information is available and is incorporated into the application.
*****
§ 507(b)(14) cross sections, maps or plans of land to be affected by an application for a surface mining and reclamation permit shall be prepared by or under the direction of a qualified registered professional engineer or geologist, or qualified registered professional land surveyor in any State which authorizes land surveyors to prepare and certify such maps or plans, with assistance from experts in related fields such as land surveying and landscape architecture, showing pertinent elevation and location of test borings or core samplings and depicting the following information: the nature and depth of the various strata of overburden; the location of subsurface water, if encountered, and its quality; the nature and thickness of any coal or rider seam above the coal seam to be seam mined; the nature of the stratum immediately beneath the coal seam to be mined; all mineral crop lines and the strike and dip of the coal to be mined, within the area of land to be affected; existing or previous surface mining limits; the location and extent of known workings of any underground mines, including mine openings to the surface; the location of aquifers; the estimated elevation of the water table; the location of spoil, waste, or refuse areas and topsoil preservation areas; the location of all impoundments for waste or erosion control; any settling or water treatment facility; constructed or natural drainways and the location of any discharges to any surface body of water on the area of land to be affected or adjacent thereto; and profiles at appropriate cross sections of the anticipated final surface configuration that will be achieved pursuant to the operator's proposed reclamation plan (as amended November 4, 1983).
§ 507(b)(15) a statement of the result of test borings or core samplings from the permit area, including logs of the drill holes; the thickness of the coal seam found, an analysis of the chemical properties of such coal; the sulfur content of any coal seam; chemical analysis of potentially acid or toxic forming sections of the overburden; and chemical analysis of the stratum lying immediately underneath the coal to be mined except that the provisions of this paragraph (15) may be waived by the regulatory authority with respect to the specific application by a written determination that such requirements are unnecessary.
SECTION 508 -RECLAMATION PLAN REQUIREMENTS
§ 508(a)(9) the steps to be taken to comply with applicable air and water quality laws and regulations and any applicable health and safety standards;
*****
§ 508(a)(12) the results of test boring which the applicant has made at the area to be covered by the permit, or other equivalent information and data in a form satisfactory to the regulatory authority, including the location of subsurface water, and an analysis of the chemical properties including acid forming properties of the mineral and overburden: Provided, that information which pertains only to the analysis of the chemical and physical properties of the coal (excepting information regarding such mineral or elemental contents which is potentially toxic in the environment) shall be kept confidential and not made a matter of public record;
*****
§ 508(a)(13) a detailed description of the measures to be taken during the mining and reclamation process to assure the protection of:
§ 510(b)(3) the assessment of the probable cumulative impact of all anticipated mining in the area on the hydrologic balance specified in section 507(b) has been made by the regulatory authority and the proposed operation thereof has been designed to prevent material damage to hydrologic balance outside permit area;