COALEX Research Reports are the products of research and analysis conducted on specific issues relating to the regulation of Surface Mining Control and Reclamation Act of 1977. The research is conducted in response to requests for information from State Regulatory Authorities, under a cooperative agreement between the Office of Surface Mining (OSM) and the Interstate Mining Compact Commission (IMCC).
COALEX refers to the Library of Surface Mining Materials maintained by OSM in LEXIS-NEXIS and is a major source for the research.
Each Report includes a list of resources which were sent as attachments to the individual who requested the research. To obtain a copy of the attachments or to obtain any additional information, contact Joyce Zweben Scall by phone at 202-686-9138 or by email at JZScall@aol.com.
COALEX STATE INQUIRY REPORT - 110
October 19, 1989
G. Milton McCarthy
Assistant Attorney General
Alabama Surface Mining Commission
P.O.B. 2390
Jasper, Alabama 35501
TOPIC: EXTENSION OF THE 90-DAY ABATEMENT PERIOD FOR "GOOD CAUSE SHOWN"
INQUIRY: 30 CFR Sec. 843.12(f) lists five specific circumstances under which an operator may be entitled to an abatement period beyond 90 days for correcting a violation. 30 U.S.C. Sec. 521(a)(3) provides that an abatement period may be "subsequently extended for good cause shown". Are the five specific circumstances which may justify an extension beyond 90 days exclusive or can such extensions be granted on the basis of other "good cause shown"? Locate any state or federal administrative or judicial decisions that may construe the regulations or any legislative history or comments that may suggest an answer to the question posed.
SEARCH RESULTS: Research was conducted using the COALEX Library, the state and federal case law files and the Federal Register available on LEXIS, and an earlier State Inquiry Report.
Two Interior Office of Hearings and Appeals (OHA) decisions were identified which ruled on the extension of the 90-day abatement period question. One district court case addresses the "for good cause shown" language; however, no materials were identified which specifically discuss the "for good cause shown" language in relation to the five specific extension circumstances enumerated in 30 CFR Sec. 843.12(f).
OHA and federal cases, legislative history material, comments and Federal Register items and STATE INQUIRY REPORT - 11 identified during the research are discussed below. Copies are attached.
OHA DECISIONS
PINEVILLE PROPERTIES CORP. v OSMRE, 104 IBLA 258, IBLA 85-735 (September 13, 1988).
"Under section 521(a)(3) of SMCRA and 30 CFR 722.12(d) [and 30 CFR 823.12(c)], [the OSM inspector] lacked authority to extend the abatement period beyond [90 days], in the absence of circumstances warranting an extension as set forth in 30 CFR 722.12(e) [30 CFR 823.12(f)]."
"Upon expiration of the 90-day peri od, OSMRE properly issues a [Cessation Order] if the permittee has taken no action to abate the violation."
UNIVERSAL COAL CO., 3 IBSMA 218, IBSMA 81-43 (July 28, 1981).
The court concluded that SMCRA Sec. 521(a)(3) and 30 CFR 722.12(d) establish clearly that
the "total time for abatement...shall not exceed 90 days" and that OSM has no "authority to extend the abatement period in a notice of violation beyond 90 days."
OLD HOME MANOR, INC., 3 IBSMA 241, IBSMA 81-29 (August 13, 1981).
"Where OSM provides the maximum time allowable under 30 CFR 722.12(d) for the abatement of a violation, an Administrative Law Judge may not effectively extend this time by granting temporary relief from the abatement requirement."
"Under present regulations a permittee's inability to comply with a proper abatement requirement cannot be the basis for extending the abatement period beyond 90 days."
FEDERAL COURT DECISIONS
(Copies of these cases are included as part of STATE INQUIRY REPORT - 11)
IN RE: SURFACE MINING REGULATION LITIGATION, 456 F.Supp 1301 (D.D.C. August 24, 1978).
The court determined that "[b]oth the House and Senate Reports support the Secretary's
interpretation of SMCRA Sec. 521(a)(3)."
[NOTE: No passages from these reports were included in the ruling; however, an excerpt from S. Rep. 95-128, 95th Cong., 1st Sess. 91 (May 10, 1977) is attached at the end of the case.]
"In addition to being ambiguous on its face, reading the provision in question in accordance with the statute as a whole, the court cannot accept plaintiffs' view" that the language of the provision permitted extensions beyond the 90-day maximum period for abatement.
PENNSYLVANIA COAL MINING ASSOC. v WATT, 562 F.Supp 741 (M.D.Pa 1983).
The court upheld the Secretary's determination that the Pennsylvania regulation which stated that additional time beyond the 90 day abatement period may granted "for the achievement of the standards of environmental protection" was too general.
"The federal regulation is quite specific and it can be seen that there is little if any room for subjective determination. Five circumstances are outlined in which extensions may be considered and we have no difficulty in concluding that Pennsylvania's broad regulation exceeded the scope of the federal provision."
LEGISLATIVE HISTORY
STATE INQUIRY REPORT - 11 which discusses the legislative history is attached.
COMMENTS
Comments on the proposed permanent program regulations from industry and environmental groups are attached.
FEDERAL REGISTER ENTRIES
47 FR 35620 (AUGUST16, 1982) Final Rules and 46 FR 58464 (DECEMBER 1, 1981) Proposed Rules.
The revision of 30 CFR Sec. 843.12(d) "removes the mandatory issuance of a cessation order to a permittee who fails to meet an interim abatement step imposed in a notice of violation."
46 FR 41702 (AUGUST 17, 1981) Final Rules and 46 FR 22902 (APRIL 22, 1981) Proposed Rules.
[NOTE: 46 FR 41701 is part of SIR -11]
"These revisions identify those limited circumstances where abatement times in excess of 90 days will be permitted and set forth the conditions that will apply to these situations."