OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT
Library of COALEX Research Reports
COALEX Research Reports are the products of research and analysis conducted on specific issues relating to the regulation of Surface Mining Control and Reclamation Act of 1977. The research is conducted in response to requests for information from State Regulatory Authorities, under a cooperative agreement between the Office of Surface Mining (OSM) and the Interstate Mining Compact Commission (IMCC).
COALEX refers to the Library of Surface Mining Materials maintained by OSM in LEXIS-NEXIS and is a major source for the research.
Each Report includes a list of resources which were sent as attachments to the individual who requested the research. To obtain a copy of the attachments or to obtain any additional information, contact Joyce Zweben Scall by phone at 202-686-9138 or by email at JZScall@aol.com.
COALEX STATE COMPARISON REPORT - 147
July 17, 1990
Anthony Abar, Director
Maryland Bureau of Mines
69 Hill Street
Frostburg, Maryland 21532
TOPICS: PERMIT, ACREAGE AND INSPECTION FEES [Update of Report No. 17, (1984)]
INQUIRY: What are the permit application and acreage fees for the following states: Kentucky, Ohio, Pennsylvania, Virginia and West Virginia? Do these states charge inspection fees?
SEARCH RESULTS: The IMCC conducted a telephone survey of the five states listed above plus Illinois and Texas. The results presented in the attached table update State Comparison Report No. 17, prepared in 1984. A copy of Report No. 17 is included for reference.
ATTACHMENTS
Survey conducted by: Beth Botsis
TABLE OF FEES
| STATE |
INSPECTION FEES |
PERMIT FEES |
ACREAGE FEES |
|---|---|---|---|
KENTUCKY |
No |
$ 375 Permit application processing fee |
$ 75 Per acre. |
ILLINOIS |
No |
-- |
$ 125 Per bonded acre when overburden is removed.
|
OHIO |
No |
-- |
$ 75 Per acre. |
PENNSYLVANIA |
No |
$ 250 Permit application fee. |
$ 50 Per bonded acre. |
TEXAS |
No |
$ 5,000 Permit fee. |
$ 120 Per acre of land which had coal or lignite actually removed during calandar year charged. |
VIRGINIA |
No |
-- |
$ 12 Per acre permitting fee. |
WEST VIRGINIA |
No |
$ 500 Quarry permit application filing fee. |
-- |